No video

GBM How-To Series // Akkerman Guided Boring Machine GBM Guidance System Set-Up

  Рет қаралды 2,882

Akkerman

Akkerman

3 жыл бұрын

The Guided Boring Method is a trenchless installation method for small diameter pipes with the grade and alignment precision the gravity sewer and water industry demand.
The pipe installation involves a three-step process starting with launch and reception shafts strategically located to minimize surface disruption. The GBM Guidance System is used for the pilot tube installation, or step 1 of the process. The GBM Guidance System provides line and grade accuracy with optic capability up to 600-lf. On the leading end of the pilot tube is the steering head with an angled tip. In the steering head is a battery-powered LED illuminated target that is visible to the operator by means of a theodolite, camera, and monitor. The theodolite is set on line and grade and is positioned to view the target through the bore of the pilot tube with the crosshairs of the theodolite visible on the monitor along with the illuminated target. The operator rotates the steering head as needed to maintain the desired line and grade. This step is complete when the steering head reaches the reception shaft.
Topics Covered:
[00:14] GBM Guidance System Case Components
[00:40] Setting up the Theodolite, Counterweight and Camera
[02:06] Secure Monitor to Jacking Frame
[02:15] Center Jacking Frame on Line with String and Plumb Bob
[02:25] Install Guidance System Mounting Stand on Jacking Frame
[02:35] Attached Theodolite to Lateral Slide on Guidance System Mounting Stand, Mount Theodolite/Camera Assemblies
[03:09] Measure Gearbox Opening to Center of Theodolite, Center and Level
[03:48] Connect Cables to Monitor
[04:05] Adjust Monitor to View String Line, Reset Horizontal Alignment on Theodolite, Adjust Stringline
[04:55] Remove Center Pin on Jacking Frame Drive Assembly
[05:35] Center the LED Target Image on the Crosshairs
[05:50] Remove Theodolite/Camera Assembly at End of Shift
Connect with us on Social Media:
/ akkermaninc
/ akkermaninc
/ akkermaninc
/ akkermaninc
/ akkerman-inc
Email us to be added to our contact list:
akk@akkerman.com
Akkerman, Inc.
akk@akkerman.com
tf: +1.800.533.0386 // 507.567.2261
58256 266th Street, Brownsdale, MN 55918 | USA
www.akkerman.com
#PilotTubeGuidedBoring #GuidedAugerBoring #PilotTubeMethod #PilotTubeMicrotunneling #PTMT #GuidedBoringMachine #AkkGBM #GuidedBoring #GuidedPipeRamming #PilotTubes #GBMGuidanceSystem #Akkerman #AkkermanInc

Пікірлер
GBM How-To Series // Installing Pilot Tubes
9:15
Akkerman
Рет қаралды 932
Little brothers couldn't stay calm when they noticed a bin lorry #shorts
00:32
Fabiosa Best Lifehacks
Рет қаралды 17 МЛН
I'm Excited To see If Kelly Can Meet This Challenge!
00:16
Mini Katana
Рет қаралды 33 МЛН
ROLLING DOWN
00:20
Natan por Aí
Рет қаралды 7 МЛН
Wirtz pumps are really clever
12:05
Steve Mould
Рет қаралды 13 МЛН
Guided Auger Boring - How it works - www.mtsperforator.com
4:44
MTS Sistemas MND do Brasil Ltda.
Рет қаралды 11 М.
Process of mass producing products in a trustworthy environment. Unique Korean factorys.
1:00:04
Pipe ramming in pipeline construction
7:17
Emil Johansen
Рет қаралды 1 М.