Рет қаралды 180
To resurface the tipping floor, asphalt had to be removed. The management wanted to improve the durability of the floor so they resurfaced it with a 12,000 psi concrete topping. During surface prep some of the original rebar had to be replaced and the port edge had to be rebuilt. The job was done over a weekend with the floor returned to service Monday morning.
The contractor who did the work was American Restore. The product used for the overlay was EucoFloor 202.