Thanks sir...please make complete vedio of whole civil engineering sub...your way of deliverying content is outstanding...please continue sir
@shikshapath99663 жыл бұрын
Thanks, I will try
@deeprajpanwar48603 жыл бұрын
Sir u have potential of becoming great teacher
@shikshapath99663 жыл бұрын
Hope so, thanks a lot
@Sahuvive2 жыл бұрын
Sir track ke liye best book kon si hogi
@HemantKumar-om8bi3 жыл бұрын
Namaskaar sir naya video aur banaiyega
@babulalsahu773 жыл бұрын
Dear Sir, During Design as mentioned in your video if grade difference is < 0.4%, vertical curves not provided, it does not mean , IN and OUT grade are made to flat with removing the Earth. The Vertical Profile is designed without any vertical curve in between the Two Grades ...means Kink is allowed in vertical profile if grade change is less than 0.4%. But in practice , During design invariably we provide vertical curve for any grade change less than 0.4% as well.
@rdbarman95213 жыл бұрын
Sir can you please provide pdf of your notes if possible.
@shikshapath99663 жыл бұрын
you can get pdf on my telegram channel @shiksha_path