GEOTECHNICAL BORED PILE CAPACITY CALCULATION by CEnaryo

  Рет қаралды 242

CEnaryo

CEnaryo

Жыл бұрын

The pile capacity is defined as the load mobilized at the pile head displacement of 10%B. the cone resistance at pile toe is used in the formulas and no averaging procedure is done.
3 Steps to get the Excel File for FREE.
1. LIKE AND FOLLOW CEnaryo Facebook Page Learn & Share
/ cenaryo-1044. .
2. Subscribe Cenaryo KZbin Channel
3. Watch and Comment your email below this Video
DOWNLOADLINK :
docs.google.com/spreadsheets/...
#CIVILENGINEERING
#estimates
#structuralengineering
#design
#CONSTRUCTION

Пікірлер: 3
@kukuhpermadi7327
@kukuhpermadi7327 Ай бұрын
Thanks for sharing
@quinnquinn9824
@quinnquinn9824 Ай бұрын
can I have a copy po the excel file that is being used in the video?
@dianaulfijannati9647
@dianaulfijannati9647 5 ай бұрын
bang boleh minta filenya?
From Bored to Driven: Demystifying Pile Foundation Choices
12:58
BEng The Brazilian Engineer in Australia
Рет қаралды 21 М.
Женская драка в Кызылорде
00:53
AIRAN
Рет қаралды 474 М.
Stay on your way 🛤️✨
00:34
A4
Рет қаралды 13 МЛН
Beautiful gymnastics 😍☺️
00:15
Lexa_Merin
Рет қаралды 15 МЛН
How to determine the pile capacity.
5:42
Structural Engineer Calcs
Рет қаралды 49 М.
The Incredible Strength of Bolted Joints
17:58
The Efficient Engineer
Рет қаралды 3 МЛН
SOLVED TIMBER BEAM DESIGN EXAMPLE
32:52
DAVID OLUMASAI
Рет қаралды 16 М.
Open Beams Have a Serious Weakness
11:02
The Engineering Hub
Рет қаралды 857 М.
GEOTECHNICAL BORED PILES DESIGN by CEnaryo
3:06
CEnaryo
Рет қаралды 127
Cara Menghitung Tulangan Bored pile
17:03
Panji S Simbolon
Рет қаралды 6 М.
Pilot Tries Dangerous & Illegal Approach!
13:21
Pilot Debrief
Рет қаралды 107 М.
static pile capacity problem
10:38
Sangeetha Manikkara
Рет қаралды 4,5 М.
SURCHARGE LOAD CALCULATION 3D
3:06
CEnaryo
Рет қаралды 46
Piling for Bridge Construction | Bored Pile Foundation| Using Tremie Method
3:25
Civil Engineer - Ishaq Sohag
Рет қаралды 2 М.