Green Line Extension Construction Updates - TPSS

  Рет қаралды 436

Metropolitan Council Meetings

Metropolitan Council Meetings

Күн бұрын

Traction powered substations, or TPSS, are being installed along the Green Line extension corridor. TPSS units convert
commercial AC electricity
into the DC power used
by the light rail vehicles.

Пікірлер
Carroll Electric substation built by Barrows Excavation
8:54
Mead Media
Рет қаралды 13 М.
World’s most advanced robotic warehouse (AI automation)
10:26
Brightpick
Рет қаралды 215 М.
小丑女COCO的审判。#天使 #小丑 #超人不会飞
00:53
超人不会飞
Рет қаралды 16 МЛН
It works #beatbox #tiktok
00:34
BeatboxJCOP
Рет қаралды 37 МЛН
Inside National Grid's Power Tunnels
2:51
Londonist Ltd
Рет қаралды 128 М.
The World Depends on 60-Year-Old Code No One Knows Anymore
9:30
Coding with Dee
Рет қаралды 1 МЛН
Manufacture of 22 large concrete caissons for the Port of Aberdeen
6:47
Autoridad Portuaria de A Coruña. Canal oficial
Рет қаралды 14 М.
Northern Line Extension to Battersea
4:50
Londonist Ltd
Рет қаралды 208 М.
923,000 lb Transformer Superload - Beyel Brothers Crane & Rigging
6:03
Big Rig Videos
Рет қаралды 1,9 МЛН
How Entire Buildings Are Moved
4:59
Insider
Рет қаралды 287 М.
Connecting Solar to the Grid is Harder Than You Think
18:48
Practical Engineering
Рет қаралды 1,3 МЛН
How to build a substation from scratch
6:03
SA Power Networks
Рет қаралды 29 М.