H0 loco depot - planning and material

  Рет қаралды 10,022

ocpfe

ocpfe

Күн бұрын

A vacant area next to the Kleiningen model railway module is to be used for the construction of a H0 parking facility with a small railway depot.
The focal point is a Märklin sliding platform (Art. 72941) with parking space for electric locomotives around it, including engine shed and maintenance hall. In the first part, the planning (track plan with SCARM) and the material (Märklin C tracks, models mainly from Faller and Kibri, substructure and background) are presented.
00:00 The preparations
02:13 Track plan
03:16 Material
04:35 Preview

Пікірлер: 12
@ewsdneax61eaxe10
@ewsdneax61eaxe10 2 жыл бұрын
this is a great channel, thank you for the english subtitle👍👍👍
@ocpfe
@ocpfe 2 жыл бұрын
Thanks for your very nice comment! Hope the subtitles are understandable. Best regards, Dirk 👍👮🙂
@carimz
@carimz 4 жыл бұрын
A very interesting video, I look forward to future updates. 👍
@ocpfe
@ocpfe 4 жыл бұрын
Thanks for your nice comment! 👍👮🙂
@sveneisenbahner
@sveneisenbahner 4 жыл бұрын
Hallo ocpfe , na da bin ich ja mal sehr gespannt drauf die Planung sieht echt interessant aus . LG Sven Eisenbahner
@ocpfe
@ocpfe 4 жыл бұрын
Vielen Dank, lieber Sven! Bin selber auch sehr gespannt ... 👍👮🙂
@andygamer8180
@andygamer8180 3 жыл бұрын
Gutes und interessantes Video allerdings passt ton und musik nicht zusammen. Man versteht doch recht schlecht. Gerade am Anfang
@ocpfe
@ocpfe 3 жыл бұрын
Vielen Dank für den Hinweis, den ich auch an anderer Stelle erhalten habe. Ab Teil 2 der Videoreihe zum Modul "H0 Abstellung mit Betriebshof" ist die Musik nur noch am Anfang und Ende zu hören. Viele Grüße, Dirk 👍👮🙂
@SteveWoodsgaming
@SteveWoodsgaming 3 жыл бұрын
Kann man die märklin schiebe Bühne für eine DC anlage nutzen?
@ocpfe
@ocpfe 3 жыл бұрын
Das sollte grundsätzlich möglich sein, wenn man den Schienenübergang sauber hinbekommt. Die Verbindung der beiden Schienenprofile muss, wie im Video zur Schiebebühnendigitalisierung (kzbin.info/www/bejne/pJmxpaJ6o8pmoLs ) bei 3 Minuten 29 Sekunden gezeigt, aufgetrennt werden. An die Buchsen B2 und 0 wird dann die Fahrspannung angelegt. Gruß, Dirk 👍👮🙂
@kjlindsten
@kjlindsten Жыл бұрын
Hi! Sorry to say, but it is impossible to hear what You are talking about when the music in the video totally takes over without any reason. /J
@ocpfe
@ocpfe Жыл бұрын
Maybe you turn off the sound and use the subtitles, which are available in English. I hope this solves your problem. Sorry for the inconvenience and best regards, Dirk 👍👮🙂
Overhead line for the H0 depot (Sommerfeldt & Viessmann)
14:36
Signals in the H0 depot station
13:10
ocpfe
Рет қаралды 18 М.
Alat Seru Penolong untuk Mimpi Indah Bayi!
00:31
Let's GLOW! Indonesian
Рет қаралды 15 МЛН
ОСКАР vs БАДАБУМЧИК БОЙ!  УВЕЗЛИ на СКОРОЙ!
13:45
Бадабумчик
Рет қаралды 3 МЛН
I Can't Believe We Did This...
00:38
Stokes Twins
Рет қаралды 79 МЛН
Kaelderkoebing   Lokwechsel   Schiebebühne
5:41
Kælderkøbing - den innovative modeljernbane
Рет қаралды 17 М.
Modellbahn Neubau: Nächste Ebene + Lok Verkauf
32:01
Schmiddko Modellbahn
Рет қаралды 4,6 М.
Märklin C track - block sections (H0 depot part 2)
8:40
Weichen stellen: Von Hand oder elektrisch?
4:43
Martin Brandt
Рет қаралды 7 М.
Gleisabdeckung (Riffelblech) für Märklin 3-Leiter Gleise
12:35