Рет қаралды 376
From the province of Bergamo to Ravenna. This is the route that two 120 tonnes heat exchangers took on Italian territory.
The loads were transported on two Marraffa convoys - which had a modular configuration with 16 axle lines - from the production plant in Filago to the commercial port of Ravenna. Here it was shipped to the BP refinery in Lingen, Germany.
#Marraffa #HeavyTransport