Highway 43-61 Roundabout Construction, Winona, MN 12-2-22

  Рет қаралды 860

Tom Grier

Tom Grier

Күн бұрын

Construction of the roundabouts on Minnesota Highway 43 (Mankato Avenue) in Winona, Minnesota, is complete for the season. There are still traffic cones in some places, and MnDOT reports they will finish landscaping work in the spring. This aerial video of the site runs a bit longer than usual (about 2.5 minutes) because it follows the entire length of the work site, and then pauses for several seconds over the US Highway 61 and Mn Highway 43 intersection to watch traffic flow. This video was shot on Friday December 2, 2022, at 8:05 a.m., by Tom Grier, Winona, Minnesota.

Пікірлер: 3
@AppaloosaDreams
@AppaloosaDreams Жыл бұрын
Thank you.
@marilynezdon4512
@marilynezdon4512 Жыл бұрын
I went thru the roundabouts this same day. From a right on Sarnia to Mankato St, then South on Hwy 61. It was about 4:20pm. I must say it worked well for me.
@bethbrink3503
@bethbrink3503 Жыл бұрын
I've been through all 4 of the round abouts numerous times with no problems. I do feel traffic flows nicely through them and once more people know how to actually drive them I feel it will be even better. Not sure how it will work if there is a stopped train for any period of time though.
🍉😋 #shorts
00:24
Денис Кукояка
Рет қаралды 3,7 МЛН
ДЕНЬ УЧИТЕЛЯ В ШКОЛЕ
01:00
SIDELNIKOVVV
Рет қаралды 3,2 МЛН
💩Поу и Поулина ☠️МОЧАТ 😖Хмурых Тварей?!
00:34
Ной Анимация
Рет қаралды 2,1 МЛН
Schlotte Family Fireworks - July 4, 2023
10:57
Tom Grier
Рет қаралды 48
HEC-RAS 2025 Demo
11:22
HEC-RAS 2025
Рет қаралды 1,4 М.
Graflex Speed Graphic Camera Demo 11 26 22 TG
1:59
Tom Grier
Рет қаралды 192
MI-5 Northeast Tieback Levee 9-23-2024
2:39
Mouse River Plan
Рет қаралды 23
Springfield KY 555 at KY 528 Roundabout
2:41
KYTC D4 Planning
Рет қаралды 4
Drive through Brookfield, IL
8:18
Svensk Fisk
Рет қаралды 133
🍉😋 #shorts
00:24
Денис Кукояка
Рет қаралды 3,7 МЛН