Thanks for sharing. Slowly but surely we will get there. I’m excited that they’re addressing the issues of rain and drainage!! I hope they are also accounting for pedestrian walkways and crossings 🙏🏾🙏🏾🙏🏾 ❤❤
@zawadiem10 ай бұрын
They are constructing sidewalks:)
@patrickpannahsr.465010 ай бұрын
Thanks Z for the update. Very informative and hope for speedy progress during the Summer
@zawadiem10 ай бұрын
Yes, yes!!
@kayelise30410 ай бұрын
Thanks Z. We move.
@zawadiem10 ай бұрын
No stopping. 😁😁 We move
@AmariaJohnson-pe7dg10 ай бұрын
Zawadi, can you please tell me what part of Broadview you guys have the land
@zawadiem10 ай бұрын
This is the RIA road oooo.
@djbenzo10 ай бұрын
So basically since I left a year ago there has been minimal progress. It looks almost the same except for everything around the 4:00 mark.
@zawadiem10 ай бұрын
We have to consider the 6 months rain factor! :)
@netehforsberg325210 ай бұрын
They need to do better than that. What is stoping them from working faster? We like to settle for mediocrity. I am so tired of us getting things done on a minimal scale and being satisfied. Other countries are moving faster in development while we are here content with 1 km of asphalt laid on road. I m sick of it. We need to do better and work faster
@zawadiem10 ай бұрын
So, when considering road construction, we need to consider several variables. Working during the 6 months of rain is not very possible. Secondly, the timeline allocated to the project aligns with the current progress.
@netehforsberg325210 ай бұрын
@@zawadiem The same excuse all the time. Because of the rain so we can't work. Other countries have rain as well as snow and they still build their roads. People even go under water and build bridges, but Liberia can't build roads for six months. This is ridiculous.
@zawadiem10 ай бұрын
@@netehforsberg3252 no, no, I’m not a huge fan of excuses. However, looking at the downpour of rain, construction work tend to be extremely slow. Compare the impact of rain during construction in the US vs. the summer time. You can’t excavate and complete foundation work due to waterlogged causing the soil to soil to be loose.
@delconteeallmyharmon552610 ай бұрын
That looks excruciating horrible take it down now!