Hey, the Super C's are certainly my favourite in the BC Ferries fleet.
@rickfeng44667 жыл бұрын
I heard BCF brought not just the ships but also the designs from FSG. So technically if BCF needs more of these we can build them right here in BC instead of outsourcing jobs.
@denelson837 жыл бұрын
Rick Feng That's correct, they did. But they had the vessels built in Germany because they wanted cost certainty, something no BC shipyard was able to guarantee.
@rickfeng44667 жыл бұрын
Alas~
@denelson8314 жыл бұрын
@coastalhiker459 For good reason. They don't want VANOC or the IOC suing 'em.
@erikg.26666 жыл бұрын
These ships already have issues with cavitation of the props. The design has the ship riding too high in the water, with the result of the props sucking air from the surface when they are in the dock. They are also having issues with the sewage system and turbochargers on the MAK 8M32C engines.
@donatotummillo13 жыл бұрын
I never knew about most of the stuff that they say about the Coastal Celebration.
@MrPointmidget3 ай бұрын
I'll take the bridge please.
@denelson833 ай бұрын
@@MrPointmidget Then go ahead and build it. But make sure you start it near Campbell River.