How To Check Formwork at Site| Formwork Inspection at Site | QC & Site Engineer

  Рет қаралды 6,226

Civil Engineer At Site.

Civil Engineer At Site.

Күн бұрын

Пікірлер: 11
@TanveerAlam-mw5im
@TanveerAlam-mw5im 6 ай бұрын
@Khanaatif08
@Khanaatif08 2 ай бұрын
Maximum tolerance in column ,how much in "mm" as per ACI
@zainulabedeen8084
@zainulabedeen8084 Жыл бұрын
Thanks allot
@chinnathambiselvarajan3603
@chinnathambiselvarajan3603 9 ай бұрын
👍
@fazalurrahman8699
@fazalurrahman8699 Жыл бұрын
sir, you check its verticality but after casting of concrete its verticality will be disturbed in my opinion
@CivilEngineerAtSite
@CivilEngineerAtSite Жыл бұрын
No if you have strong support
@sahiransari3288
@sahiransari3288 Жыл бұрын
@@CivilEngineerAtSite If we checked the again verticallity after concrete.if any disturbance of formwork support. can we fixed tha?
@muhammadasim3143
@muhammadasim3143 2 ай бұрын
@mohammedsajjad8476
@mohammedsajjad8476 Жыл бұрын
Assalamualaikum What's your job position?
@CivilEngineerAtSite
@CivilEngineerAtSite Жыл бұрын
QAQC Engineer
@CivilEngineerAtSite
@CivilEngineerAtSite Жыл бұрын
Yes. Inspector is junior or diploma holder. Engineers are graduated and senior
How Strong is Tin Foil? 💪
00:26
Preston
Рет қаралды 139 МЛН
Do you choose Inside Out 2 or The Amazing World of Gumball? 🤔
00:19
💩Поу и Поулина ☠️МОЧАТ 😖Хмурых Тварей?!
00:34
Ной Анимация
Рет қаралды 2,1 МЛН
Columns Shuttering inspection prior to concrete
6:25
Building Construction | Civil Engineers
Рет қаралды 589
How To Submit Materials Inspection Request MIR| Important Documents For MIR.
12:39
Civil Engineer At Site.
Рет қаралды 18 М.
Formwork Inspection |SAES-Q-001| & | ACI 347| #aramco
9:21
2i Constructions
Рет қаралды 2,3 М.
How Strong is Tin Foil? 💪
00:26
Preston
Рет қаралды 139 МЛН