You remain the one person to bring justice to this estimation on this KZbin so far. By the way, kindly avail us how you arrive at 0.275 You swift response will be highly appreciated. Thanks a lot
@kelvinikiriko7732 ай бұрын
please has he reply you on the question you asked? base on the 0.275
@franklinobiukwu34834 жыл бұрын
I find this video educating. You're doing great!
@9-5data4 жыл бұрын
Thank you
@georgerether796 ай бұрын
Nice work mister
@obadex3 жыл бұрын
Great work keep it up
@abbafary1445 Жыл бұрын
The vid is educative sir kudos. My Question here is, how did uou arrived at getting 0.275 vertical mortar? Thank you best regards
@folexkendrick2 жыл бұрын
Please does this account for the plastering too?
@dapoabolarinobj81054 жыл бұрын
Bravo, Engr!
@9-5data4 жыл бұрын
Thank you sir.
@kelvinikiriko7732 ай бұрын
hi good morning, do you understand how the 0.275 on the vertical mortar comes about?
@kelvinikiriko7732 ай бұрын
@@9-5data hello boss please throw more light on the 0.275 vertical mortar you got thanks
@georgerether796 ай бұрын
How did the Height of the horizontal mortar change into 275mm or 0.275
@tushabejoseph73772 жыл бұрын
How did you obtain 0.0637 in the calculation of bed mortar/horiz mortar??? . explain am lost from dt very point
@tushabejoseph73772 жыл бұрын
And by calculation how did you get the 10 blocks ? Minus assuming
@garpeeroberts55803 жыл бұрын
Hi, how did you obtained the 0.275 in the vertical mortar area calculations?
@theslickking-majura57992 жыл бұрын
my question exactly
@ovuosita4 ай бұрын
Sir, how did you arrive with 0.275 ?
@AguEmmanuel-kn8qt9 ай бұрын
Pls how did u get the 0.275
@temidayoafolabi73447 ай бұрын
for the vertical, the height of the block is 225mm. Now add the 25mm mortar at the top and also the one at the bottom of the block. You will have 25mm + 225mm + 25mm = 275mm, You can check the diagram at 2:44 . Check the red boxes.
@divinennate3226 Жыл бұрын
Pls how did you arrive at 1.3 and 1.1 as percentage of 30 and 10 respectively
@temidayoafolabi73447 ай бұрын
This is how, assume the wet volume is 1 cubic meter, we are told that the dry volume is 30% more that the wet volume. What this means is that you will add 30% of wet volume to the 1 cubic meter value of the wet volume. see, Wet vol. = 1m3 Dry vol. = (30% of 1) + 1 =(30/100 * 1) + 1 =(0.3 * 1) + 1 = 0.3 + 1 = 1.3. therefore, for every 1 m3 of wet volume, we have 1.3 m3 of dry volume. 1.3 in other words is a constant.
@theslickking-majura57992 жыл бұрын
Sir kindly explain how you arrived at 0.275
@acheampongkoranteng48473 жыл бұрын
Can this be applied to solid blocks?
@9-5data3 жыл бұрын
Check the channel to see video on solid blocks
@olatundelateefat51774 жыл бұрын
🙌🙌🙌🙌
@emmanuelodoba46234 жыл бұрын
Barca go still go trophyless
@9-5data4 жыл бұрын
Hmmmmm. Thanks for your concern
@alsemi-back-up579 Жыл бұрын
TOO COMPLICATED!!!!!!!!!!!!! HOW MANY BAGS OF MASONARY FOR HOW MANY BLOCKS!!!!!!! IT IS NOT ROCKET SCIENCE MAN!!!!!!!!!!!!!!