HELLO SIR , PLEASE MAKE A VIDEO ON THE TOPIC ARE :- (1) HOW TO SHIFT TBM . (2) HOW TO SHIFT FLY TBM . (3) HOW CHECK THE REQUIRED EXCAVATION LEVEL BY MAIN TBM OR ALSO ANY ONE FLY TBM VALUE . (4) HOW TO CHECK THE TOP AND BOTTOM LEVEL OF ANY EARTHCRUST LAYER BY MAIN TBM OR ALSO BY ANY ONE FLY TBM . (5) HOW TO CALCULATE THE QUANTITY OF EACH AND EVERY EARTHCRUST LAYER BY USING THE OGL DATA WE ARE TAKING FROM INITIAL STAGE OR BEFORE EXCAVATION STARTS. (6) HOW TO MAKE EXCEL SHEET FOR THESE ALL WORKS AND CALCULATE .
@AbhishekMishra-ih1zk4 жыл бұрын
Sir...agar pier vertical shaft ke number of bars diye ho...to unki spacing nikaal kar unko kis type se arrange karke lagwaye, please iske upar ek video aur banao
@technicalengineer12354 жыл бұрын
Drawing ka pdf ka link bhi diya kijiye na sir apki vidio bahut helpful hoti hai
@Sandydutta19969 ай бұрын
Bottom slab mei alag sei 1:1000 slope dena parega?
@CivilGyaan9 ай бұрын
Yes..
@rajnishsingh78814 жыл бұрын
Sr important iscode bta dije jo use hota h..
@swapnilpatil86444 жыл бұрын
Thanks sir
@rajeshsisodiya15244 жыл бұрын
Thanks ,sir
@satutmishra521 Жыл бұрын
Main excavation to apne bataya nhi . Section "D" ka.iska excavation kaise karege
@doyouknow35924 жыл бұрын
Sir, what about difference of GL and raft top which should be either equal to 0 or raft should be 300mm below GL? Can't we determine excavation by avg OGL @20m LHS N RHS.
@CivilGyaan4 жыл бұрын
Yes you can, if the levels are mismatching with actual invert level on site. But if the consulting engineering is forcing you to follow drawing standards then you must proceed with the given data. In most of the cases raft top remains between 0 to 300 mm, if it is not then you should state it to the consultant first.
@doyouknow35924 жыл бұрын
Sir plz explain why OGL is given at 20m LHS n RHS. I have seen it in many of my site drawings but couldn't get satisfactory answer.
@CivilGyaan4 жыл бұрын
I am also confused with such practice but I think it is done in order to achive future construction requirements, i.e. six laning. NOT SURE.
@bridgeandhighwayengineerin78514 жыл бұрын
Sir agar srf FRL ur MIN BED LEVEL DIYA HO TO KAISE EXCAVATION KRENGE UR ROAD KA BI KOI FRL NI H TO KAISE EXCAVATION KAISE KRENGE
@CivilGyaan4 жыл бұрын
Aise case me min invert level se 300 mm down raft bottom rakha jaata hai, aur road ka frl na ho aisa possible nahi hai, road ki sabse zaroori chij to wahi hai.
@rajnishsingh78814 жыл бұрын
Sr concrete ki quantity k according steel kinti ayegi approx kase nikalege
@CivilGyaan4 жыл бұрын
1.5 % of concrete quantity, for the purpose of estimate only.