How To Install the SnoFree™ Panel Eave System

  Рет қаралды 678

Heat Trace Specialists

Heat Trace Specialists

Күн бұрын

This video demonstrates how to install Heat Trace Specialist's SnoFree Panel Eave System.
Install the supplied 4-foot leap to the surface on top of the ice and water shield layer attached with pan headed screws or flat roofing nails, a minimum of 18 inches on center. Install six inch or 12 inch strip of ice and water shield over the install cleat to ensure proper protection. Ensure that the protective layers properly attached to the upper protective layer with minimal wrinkles or gaps.
Hook the lower open hem with the install cleat and rotate properly until the base is resting on the roofing deck. Once the
base is firmly on the roof attached lower base with panhead screws or flat headed nail between two inches and three inches from the back of the base to ensure that penetration are protected. Once the cover is installed seal all penetration remove any protective plastic from the panel prior to the next step.
Set the extrusion into the corresponding channel, leave adequate space between the end of the extrusion and any end caps or end walls for the heating cable to pass through to the next chamber or to bend around to start the second pass of cable into the extrusion. Insert heating cable in extrusion channels, inspect the extrusions and make sure that all edges are free of rough cuts or metal cutting birds. Any obstruction that can cause harm to the tubing or the jacket of the cable can cause damage to the working capability of the system.
In this clip we are showing how to mark out a Valley cut while attaching the top cover. Use the measure and fold method to approach any rake ends and walls aware SFP eave system will terminate. Measure the depth of the extrusion and proceed to leave sufficient material on the cover to fold down in order to cover the height difference in the panel to the roof deck. In a standard installation ensure proper water protection from the roof by using Valley metal. Counter flashing, step flashing, sealant, or any other common roofing material to properly funnel the water away from the exposed roof deck. Attach the cover by hooking the back open hem into the base lip pulling towards the front of the eve panel. Once there is a proper continuous connection made, push downward on the top edge of the cover to snap the cover over.
The base panel attach the final fasteners through the top cover and remove any protective plastic that may be on the SPF system at any finished edge that may have heat cable or hydraulic tubing. Mark an opening in the previously folded metal and remove
sufficient material to allow for no contact of heat element.
Similar to the top cover installation, the expansion joint should properly span the space between the covers use a proper roofing sealant to hold the expansion joint to the surface of the SPF cover. With no fasteners needed after the system is complete we suggest installing a second layer of ice and water shield over the top section of the SFP eave system where the roofing material will probably cover the barrier.
Do not install the barrier below the first bend in the top cover. Once all exposed areas are covered finish the roof with the chosen roofing material.
Let Heat Trace Specialists protect your investment. Call us today at 877-244-1055 or visit our website at www.heattracesp... to see how we can help you with all of your ice dam prevention, concrete snow melt, and piping needs.

Пікірлер
Heat Cable Tee Kit Tutorial
12:35
Heat Trace Specialists
Рет қаралды 7 М.
Surface Snow Melting | How It Works
1:26
nVent Thermal
Рет қаралды 2,6 М.
How Strong is Tin Foil? 💪
00:26
Preston
Рет қаралды 63 МЛН
So Cute 🥰
00:17
dednahype
Рет қаралды 50 МЛН
Пришёл к другу на ночёвку 😂
01:00
Cadrol&Fatich
Рет қаралды 9 МЛН
Новый уровень твоей сосиски
00:33
Кушать Хочу
Рет қаралды 3,9 МЛН
Get More Heat From Your Radiators ~ System Balance
16:36
Skill Builder
Рет қаралды 947 М.
Massive Changes Are Coming as We Near the End of Our Build
20:01
Good Simple Living
Рет қаралды 181 М.
I WISH WE SAW THIS COMING...
32:48
Trent & Allie
Рет қаралды 189 М.
no end in sight.
20:22
More Than Farmers
Рет қаралды 27 М.
How I Built A DIY Luxury Butler’s Pantry Full Build
24:43
Builders Blueprint
Рет қаралды 45 М.
Heat Cable Hardwire Tutorial
10:28
Heat Trace Specialists
Рет қаралды 4,8 М.
#130 Mushroom Lunch, Building Formwork, First Zucchini
36:02
Martijn Doolaard
Рет қаралды 240 М.
Heat Cable Splice Kit Tutorial
8:57
Heat Trace Specialists
Рет қаралды 18 М.
Heat Cable End Seal Tutorial
1:54
Heat Trace Specialists
Рет қаралды 13 М.
How Strong is Tin Foil? 💪
00:26
Preston
Рет қаралды 63 МЛН