Рет қаралды 5,027
Step by step to make it easier for you to install our Aegis Plus RMU by Lucy Electric:
Incoming function
There are 3 steps to operate incoming switches which are;
1. OFF (Indicator will show GREEN). Green means the circuit is open
2. Select (Turn switch to the GROUND (Earth) or MAIN). It has 2 selectors which are Ground (EARTH) - single line will be horizontal - and MAIN - single line will be vertical.
3. ON. There are 2 options for ON which are ON Earth (indicator will be Yellow) and On Main (indicator will be Red)
Open and close the Outgoing or Circuit Breaker function.
1. OFF (Indicator will be GREEN). OFF is achieved by pushing Trip button, then the Green indicator means the circuit is open
2. Select (Using the handle to turn the switch to the GROUND (EARTH) or MAIN). It has 2 selectors which are EARTH (single line will be horizontal) and MAIN (single line will be vertical).
3. ON. There are 2 options for ON which are ON Earth (indicator will be Yellow) and On Main (indicator will be Red)