Revised for 2020. In this video, learn how to properly address both the MXZ-C outdoor unit and the branch box in a multi-zone system.
Пікірлер: 5
@WGwarrior204 жыл бұрын
Can you show a video how to Vaccum down the systems when 4 zones using a branch box
@jorgevvrod2 жыл бұрын
@warrior90 I noticed no one ever responded. There is nothing different to do on a residential branch box system compared to any other split system you vacuum on the regular basis. The Expansion Valves, for indoor unit metering, are located in the branch box and they can never fully close. So there is no need energize equipment and do anything special to make them open up.
@DaveT-z3g10 ай бұрын
Other than the address settings, does switch 5(S5) in the outdoor unit, require changes for proper monitoring?
@45KevinG45 Жыл бұрын
What if there is no branch box? Just 1 outdoor unit and 1 indoor unit?
@scottschweigert1657 Жыл бұрын
these MXZ outdoor units need at least 2 indoor units i believe