In CA (Los Angeles), you pull the permit thru LADWP, they come out and determine the drop from the line coming in, so that you are placing the electrical panel the shortest distance to your home from the drop.
@Therealhomeinspectionauthority2 ай бұрын
Thats correct
@joelbaugh46932 ай бұрын
So in my state if we pull a permit and the house is lived in we the electrician will tie the new service in and if the homeowner doesn’t bug the utility company they won’t won’t come out and do their part all tho we would have moved it from the the tension line for them
@Therealhomeinspectionauthority2 ай бұрын
Interesting, over here in California when you pull a permit all utilities are automatically in the loop from DWP, they know about your install and know there roll in finalizing it.
@slaugh77ify2 ай бұрын
No seal on flashing either
@Therealhomeinspectionauthority2 ай бұрын
yes i did see that. sloppy work
@Kurt-the-Electrician2 ай бұрын
The flashing isn’t correct, and neither is anything else.lol
@4gizzle852 ай бұрын
Hahahahahaha dude look close it’s already done ✔️… and they connected to the point of attachment on the roof in back .. utility company more likely than not will hook anything up as long as ya leave them enough out of the mast.. usually specified longer for higher voltages by utility .. utility will then cut back if deemed necessary.. NEC also has some exceptions here so this actually probs would end up flying even though looks bad
@Therealhomeinspectionauthority2 ай бұрын
Hahahahahaha dude, are you telling me your ok with this install? Is this the quality of work you offer? Look closer, they actually installed another cable mount on the new mast head, Why would they do that if they did not intend to relocate the mount? This is sloppy unfinished work here on earth one.