Рет қаралды 36
How to turn on MRI system from start to finish. This procedure applies to all current GE MRI systems.
How to turn on GE MRI systems per the GE MRI power on procedure. Compatible systems include GE Signa series MRI systems with an ACGD PDU cabinet.
Full article with step-by-step procedure available at www.medicalima...
Please leave a like if you found this video to be helpful and consider subscribing to the channel if you are interested in medical imaging technology. Thank you for your support!
The first step is to apply power to your main disconnect by ensuring the incoming power knife- switch is on in the upright position. Once power has been applied to the MRI main disconnect, press the 2 green buttons labeled main power on and pdu power to apply power to the MRI PDU cabinet. We can now head to the ACGD PDU cabinet to turn on the GE MRI system. The GE MRI power distribution cabinet can be easily identified by locating the power selector switch and the big red and green button on the lower half of the cabinet. Lets examine the power selector switch on the left side. Systems that have been powered off using the red power off button require a reset to the power selector switch before power will be supplied to the MRI system. To reset the PDU incoming power switch, lift the switch in the counter clockwise direction until the selector switch is sitting in the horizontal position. Now that your selector switch has been reset, flip the switch down to the vertical position to turn on the ge mri scanner. This video provides all the steps needed to get your MRI system powered on and scanning patients. I am always happy to answer any questions you may have about the procedure or any issues with your system.
Copyright © 2024 MRIPETCTSOURCE LLC. All rights reserved.
Unauthorized use or reproduction of any content, images, or intellectual property is strictly prohibited and may result in legal action.