Рет қаралды 5,643
If you want to do a SIV training with your LIBRA RS, you will need to order a Folding Line Set from your SWING dealer or directly from SWING.
The Folding Line Set is necessary to be able to simulate the manoeuvres relevant for the homologation. For this purpose it is mounted in the foremost position before the A-lines on the lower sail of the canopy and on the riser.
With this Folding Line Set , front stalls and side collapses can be flown and trained in 2-liner SIV training just like any other 3-liner. This Folding Line Set comes fully assembled and color coded ready to install.
In the video the function of the Folding Line Set, the installation and the handling in the SIV training is explained in detail. Alessio Cassola answers the most important questions of LIBRA RS pilot Philipp Ott regarding the SIV training with the EN-C 2 liner.
Philipp performs accelerated and unaccelerated front stalls and side collapses with his LIBRA RS and the mounted Folding Line Set and shows how he initiates them with the folding line set.
To learn more about the LIBRA RS, click on this link:
www.swing.de/p...
If you want to check and adjust the trim on your LIBRA RS yourself, check out the SWING Trim Tuning Tutorial for your LIBRA RS & SPHERA RS by clicking here:
• SWING Trim Tuning Tuto...