Remember, on multi-station decoders, you assign station number to first station and the program will automatically assign sequential station numbers to remaining stations on the decoder. For example..when u program a 2-station decoder, maybe you assign station number 4 to first station then the program will automatically assign station 5 to the other remaining devoder station. For a 6-station decoder if you assign the first station as #10 then the program will automatically assign the remaining stations as 11, 12, 13, 14 and 15 👍
@janneels78732 жыл бұрын
Thanks!
@Assassin70012 жыл бұрын
Thanks, was wondering about this
@Rfc479013 ай бұрын
Thank you!!!!!
@DrewC-ez1fj2 ай бұрын
*THANK YOU!* That’s what I came here for! Good lookin’ out brotha!
@fpplsoftwashpressurewashin8757 Жыл бұрын
I would recommend twisting your wires together prior to insertion into the wire nut. This is a much better connection.
@Hunter_Landscape_Irrigation6 ай бұрын
Thank you
@theoneandonlycole5 жыл бұрын
I have a question in regards to our 2 wire system. When we run station 1 (set at 45 min run time) on our 4 station decoder it runs for about 10 min and then the water (valves) shuts down but the time clock keeps counting down like the valves are still open. The other 3 stations run normally for the whole run time. What would cause this? Thanks!!
@brianlatkowski20374 жыл бұрын
I am on a site that has the same controller. They currently have 99 decoders on the system. It is there request to install more decoders in a different section we are working on. My question is, will another module, be added or will another controller have to be installed? It will be another 60 decoders.
@ItsThaKidTv2 жыл бұрын
I’m tryna figure out the same thing
@ALAN-gn4ud2 жыл бұрын
Swap out to an ACC2 Controller. Don’t have to reprogram all the decoders just change the controller.
@ALAN-gn4ud2 жыл бұрын
@@ItsThaKidTv acc2 controller. Just swap the controller out. Decoders all same and the programming is in the decider not the controller so it’s an easy swap
@WaterDesignirrigation7 жыл бұрын
Now I need to hire a computer technician to help me in the field.
@lorenzobarrios40176 жыл бұрын
Estoy tratando de programar un decoder exactamente a ese. Icd200 2 station decoder solo que no me da la opcion para programar la segunda estacion. Como programo la segunda salida? Oprimo los botones de flechas izquierda o derecha y no encuentro la opcion en ningun lado. Aqui en el video solo enseña como programar una estacion en un decoder doble. Puede hacer un video o darme alguna informacion?
@smartyardhouston6 жыл бұрын
No se puede cambiar de el control. Se programan automaticamente en orden. Nomas con un ICD HP puede cambiarlos....
@Josesal743 жыл бұрын
Hello there, What about when the controller it’s showing a attention alarm msg What can I do to troubleshoot this problem I am not very familiar with this unit
@Hunter_Landscape_Irrigation3 жыл бұрын
Hi Jose, our technical support team can assist you. Please email support@hunterindustries.com
@conanbrown70616 жыл бұрын
what do you do after plugging decoder into the ports and decoder is not found?
@rameldaiz24922 жыл бұрын
What kind of decoder, acc2 and icd 100 decoder
@ario1mich6 жыл бұрын
Good controllers, easy to work with it.
@GalaXy8087 жыл бұрын
what if not connecting to the computer station?
@pedrobalderas73737 жыл бұрын
tengo un contro Hunter Acc aunque este apagado se prenden barias estaciones algien me podria desir cual es el problema
@brucelopez697 жыл бұрын
Pedro Balderas tu control ya no funciona correctamente, nesecitas reemplazarlo
@adictwow5923kgs5 жыл бұрын
Thank you very helpful
@TaxinGigs2 жыл бұрын
Thanks
@Hunter_Landscape_Irrigation6 ай бұрын
You're welcome
@southernreign17 жыл бұрын
I do not understand why these wire connections are not twisted (and soldered) before the wire nut is installed.
@smartyardhouston6 жыл бұрын
All these systems would be much less problematic if they would be soldered. Is there any device that soldering quickly in the field?
@bobbymartin76404 жыл бұрын
Not really because what if you’re Solinoid goes bad then you have to cut a re strip that connection again plus if used correctly dby connectors will not give you problems even the. Slime is voltage Rated to with stand shock and it won’t wash off your hand so you know water is not getting into it
@joselozano97497 жыл бұрын
Me gusta gracias por el video
@WaterDesignirrigation7 жыл бұрын
This isn't going to work for Hunter. Most techs , I am one for 27 years, none of my workers could handle this. Job is hard labor and not cut out for guys that can handle this stuff.