At IEA, one of our core values is innovation. This means that we are continually finding innovative solutions to add value to all the projects that we lead. At the end of the day, we want to be an organization that investigates and implements new products to ensure that we’re cutting down our carbon footprint.
Recently, IEA invested in the industry-leading Vermeer PD10 pile driver. This machinery communicates directly with the Trimble Groundworks system to not only locate the exact location of the pile, but also ensures accurate plumpness, alignment and proper depth. This is a notable improvement over the traditional method of using string lines to align the posts, which had a higher risk of error, longer set up time and added trip hazards. Since depth is managed using GPS, the site no longer has to worry about ensuring the entire site is to grade, which is a large cost saving to the company, as well as our clients.
On top of accuracy, the PD10 pile driver also saves the team time. Traditionally, driving each pile would take approximately 90 seconds. With the new machinery, the team now can save up to 30 seconds on each pile. With 12,599 at Baxley, this is a substantial saving for both IEA and our client.
As we stay on top of advancing technology and the changing needs of our clients, we feel confident in the services that we offer. "Innovation has to be continuous at IEA, and the procurement and deployment of these machines have certainly innovated our solar work," said Chris Hanson, Executive Vice President, Operations. As the solar industry continues to scale and our intensive list of owned machines and resources grow, IEA's ability to perform at the highest caliber is second to none.

Пікірлер: 13
@SolmaxSolarpanel-vs4tq
@SolmaxSolarpanel-vs4tq Жыл бұрын
PV ground bracket +Easy and fast installation without punch holes. Match 980mm-1134mm width solar module.
@JJRoemie
@JJRoemie 3 жыл бұрын
🔥🔥🔥
@grtivjskaldsinfhsnak
@grtivjskaldsinfhsnak 3 жыл бұрын
Awesome
@DemonaterTheAce
@DemonaterTheAce 8 ай бұрын
Baxley ??? how come I never heard of it I could’ve been home
@user-gl8ld7ur1q
@user-gl8ld7ur1q 10 ай бұрын
Play the installation without music
@lisagaffin8780
@lisagaffin8780 6 ай бұрын
Waste of money as that crap takes over farmland
@joanreyes8323
@joanreyes8323 2 жыл бұрын
Cuando viene RD
@jesseriley8745
@jesseriley8745 Жыл бұрын
I was there
@RajeshSharma-zt8ow
@RajeshSharma-zt8ow 6 ай бұрын
Hello sir ji
@RajeshSharma-zt8ow
@RajeshSharma-zt8ow 6 ай бұрын
I need work please
@edward445689
@edward445689 6 ай бұрын
What a waste of farm land. These guys so proud to be ruining the land. Bet they look back in 10 years and say what I have I done.
@federicosavanelli180
@federicosavanelli180 Жыл бұрын
La Li ?palixfotovoltaivico
PD5 and PD5R Pile Drivers in Action
4:39
Vermeer
Рет қаралды 8 М.
Pile Foundation Design and Construction | Pile Driving Series #1
14:09
Running With Bigger And Bigger Feastables
00:17
MrBeast
Рет қаралды 199 МЛН
女孩妒忌小丑女? #小丑#shorts
00:34
好人小丑
Рет қаралды 99 МЛН
Pile Driving Introduction
9:32
MyFDOT
Рет қаралды 138 М.
Solar Panels Plus Farming? Agrivoltaics Explained
12:53
Undecided with Matt Ferrell
Рет қаралды 5 МЛН
Pile driver operation and safety
27:26
Vermeer
Рет қаралды 3,3 М.
How to erect a solar power plant: reference project by mp-tec
5:44
How a Solar Farm is Constructed From Beginning to End
6:13
Spark & Foster Films
Рет қаралды 66 М.
55MWp Van Arısu GES - Sahada Kullanılan Teknolojiler
10:00
Solarian Enerji
Рет қаралды 10 М.
ATI DuraTrack HZ v3 Sample Installation Video
3:48
Gerude90
Рет қаралды 5 М.
The PD10R pile driver with automation in action
4:03
Vermeer
Рет қаралды 55 М.
Union Carpenter Pile Drivers
7:18
Carpenter Contractor Trust
Рет қаралды 16 М.
Running With Bigger And Bigger Feastables
00:17
MrBeast
Рет қаралды 199 МЛН