Indian Railways SEJ ( switch expansion joint )

  Рет қаралды 16,171

Civilology by Gaurav

Civilology by Gaurav

Күн бұрын

A Switch is an arrangement that enables the train to change its track so that it proceeds in the correct direction. This SEJ is a device, installed at the end of LWR/CWR, to allow the longitudinal movements in the breathing length due to temperature variations or we can say it is an arrangement that compensates with the natural changes in the track due to temperature variations and protects the technical standard dimension of the same. This arrangement ensures that there is no considerable variance in the parameters of the track so that there is no hindrance is created in the passage of the wheel over it. Both expansion and contraction are dealt with by the SEJ

Пікірлер: 5
@krishnamurthy9868
@krishnamurthy9868 3 жыл бұрын
Tq for clearly explain 👏👏👏
@TheSam96910
@TheSam96910 3 жыл бұрын
nice 👍
@subodhminj7709
@subodhminj7709 Жыл бұрын
Most important thing is 🚃🚃🚂🚃🚂 railway track.
@premchandbairwa3426
@premchandbairwa3426 Жыл бұрын
Gap ketna ho na chahiye
Inspection of LWR and maintenance
19:40
NER IZN Safety Training
Рет қаралды 3,9 М.
My Daughter's Dumplings Are Filled With Coins #funny #cute #comedy
00:18
Funny daughter's daily life
Рет қаралды 24 МЛН
SHAPALAQ 6 серия / 3 часть #aminkavitaminka #aminak #aminokka #расулшоу
00:59
Аминка Витаминка
Рет қаралды 2,9 МЛН
🍉😋 #shorts
00:24
Денис Кукояка
Рет қаралды 4 МЛН
glued joint in railway track reconditioned glued joint
7:27
Rohit curve vlogs
Рет қаралды 11 М.
Switch Expansion Joint, Tongue Rail, Check Rail, Stock rail In Hindi
4:14
SEJ Gap during welding#education 🙏🙏
14:03
civil tech for all
Рет қаралды 771
SEJ ! What is SEJ ! Function of SEJ ! Switch expansion joint
5:40
Expansion Joints of Bridge, Methodology Explained behind Expansion Joints.
3:04
HOW to Measure  SEJ
1:26
Rail tech
Рет қаралды 1,1 М.