Here are more information on the technical layout of my inverter setup.
- 8kVA DEYE hybrid inverter
- Stage 2 (7.68kWh, 1C) VOLTA battery
- 2 Strings of 4x 550W JA solar panels
(more panels will be beneficial during winter)
50A breakers to inverter
40A breaker from inverter
40A ELU before Essentials loads
25A ELU (or 2P breaker) to Smart Load
Geyser 1 - 150L - 3kW
Geyser 2 - 200L - 2kW (replaced element)
Auto change-over switch to geyser with
- Smart Load feed
- Grid feed via Smart Timer
(set via App on rainy days)
Relay - powered by geyser no.1's power from element (after thermostat)
Relay switches geyser no.2 off when no.1 is on
and visa versa.
Timer unit on main Smart Load output to limit usage time to between 10am - 3pm
(prevents unnecessary use of battery by
Smart Load in late afternoons)

Пікірлер: 8
@ameercader
@ameercader 23 күн бұрын
Thank you so much ! My inverter is not showing any battery information. The yellow lan cable is connected to CAM don't know what is going on please help
@schunkelndedschunke6914
@schunkelndedschunke6914 7 ай бұрын
Well done. Greetings from Austria.
@bolandsystems9707
@bolandsystems9707 7 ай бұрын
Thanx.
@tiamiyuoladele1902
@tiamiyuoladele1902 23 күн бұрын
Hi please I need a guide to connect sunark lithium battery connection chatting from Nigeria :
@ThePonderi
@ThePonderi 7 ай бұрын
You should consider more panels they are getting cheaper.. especially that you have 2 geysers. Solarways warehouse have better prices for the panels.
@ThePonderi
@ThePonderi 7 ай бұрын
Very inteeresting. How lon do you heat up a single geyser? I understand they are 2kw ?
@bolandsystems9707
@bolandsystems9707 7 ай бұрын
It depends on how empty (cold) it was. If almost fully empty (cold) a 150l will take 1h30min on 3kW. If heated with solar power, I turn it up to 60°C to last till the morning. I have a 200l with 3kW element in, but use little water to pre-feed a regulated temp geyser (Harver 30l induction) If fully empty, I guess a 200l, 2kW will take around 3h. With enough sun, it's ideal. Smart Load starts around 10:30am (summer) You then have until 4pm to heat the geyser (4.4kW panels as minimum)
@sakkieplakkie204
@sakkieplakkie204 7 ай бұрын
Good day Nice Installation. Do you mind sharing your drawings please. Regards
Smart Load feature on Deye inverter used to max.
13:00
Boland Systems
Рет қаралды 10 М.
The Ultimate Off-Grid Inverter: SunSync 8.8kW Review -Off grid day 45
21:27
王子原来是假正经#艾莎
00:39
在逃的公主
Рет қаралды 15 МЛН
7 Days Stranded In A Cave
17:59
MrBeast
Рет қаралды 96 МЛН
English or Spanish 🤣
00:16
GL Show
Рет қаралды 8 МЛН
Have We Been Doing Solar WRONG All Along? 🤷🏻‍♂️
19:48
Artisan Electrics
Рет қаралды 162 М.
Deye 8KW Solar Hybrid Inverter (Unboxing & Features)
6:26
Zurrian Networks
Рет қаралды 1,6 М.
Master class: Installation and configuration of the Deye 8 kW inverter #inverter #installation #Deye
17:40
Gselectro-energia solar, paneles solares,
Рет қаралды 62 М.
EEVblog 1620 - Deye Solar Hybrid Inverter EXTREME TEARDOWN
41:19
Solar Kit vlog vol1: What is the Deye inverter capable of?
11:47
SolarKit Europe
Рет қаралды 4,2 М.
EG4 18KPV- 48V Hybrid Inverter: 18,000W PV Input | 12,000W Output | 120/240V Split Phase
24:21
DIY Solar Power with Will Prowse
Рет қаралды 311 М.
Deye Sun 12K  Hybrid Inverter SG04LP3 - Detailed Review after 1 Year
23:13
GigiBelea aka JAX
Рет қаралды 23 М.
王子原来是假正经#艾莎
00:39
在逃的公主
Рет қаралды 15 МЛН