Is there any place where these slides are available?
@markod39572 жыл бұрын
From the system diagram, is it being implied that the batcher and output proposer are separate parties (as in 2 different entities) that could individually be at fault if a challenge is raised? Or are these roles of output proposer, sequencer, and batcher all 1 entity? Excellent presentation btw