Jack-up System - Accelerated Bridge Construction | Enerpac Heavy Lifting Technology

  Рет қаралды 47,648

ENERPAC

ENERPAC

Күн бұрын

Accelerated Bridge Construction methods (ABC) minimize highway traffic disruptions and downtime. The process can be carried out using a synchronous multi-point lifting system, such as a jack-up system be placed on top of a self-propelled modular transporter (SPMT).
The system provides a hydraulic solution for lifting, transporting and installing a prebuilt bridge deck.
See a wide range of heavy lifting solutions on the Enerpac website www.enerpac.co...

Пікірлер
Installation of Venice MOSE Caissons | Enerpac
10:48
ENERPAC
Рет қаралды 26 М.
Hydraulic Gantries | Enerpac Heavy Lifting Technology
8:27
Flipping Robot vs Heavier And Heavier Objects
00:34
Mark Rober
Рет қаралды 53 МЛН
Сюрприз для Златы на день рождения
00:10
Victoria Portfolio
Рет қаралды 1,9 МЛН
Это было очень близко...
00:10
Аришнев
Рет қаралды 2,8 МЛН
Крутой фокус + секрет! #shorts
00:10
Роман Magic
Рет қаралды 41 МЛН
[DHLS] 100ton Jack Up System 잭업시스템
2:28
DHLS Heavy Lifting System
Рет қаралды 364
Bridge construction - Incremental Launching - 3D Animation
6:51
Bridge installation over Ohio River breaks records
2:21
Mammoet
Рет қаралды 10 М.
Transformer (Jack & Slide)
4:33
Contractors Cargo
Рет қаралды 138 М.
[DHLS] 400ton Skidding System 저상형 유압 이송시스템
1:41
DHLS Heavy Lifting System
Рет қаралды 840
Flipping Robot vs Heavier And Heavier Objects
00:34
Mark Rober
Рет қаралды 53 МЛН