Jalalpur Irrigation Project | M/S SWEG-RSL JV | JALALPUR SHARIF

  Рет қаралды 743

Channel U

Channel U

Күн бұрын

The command area of JIP is in the form of long strip of land bounded by the salt range hills on northern side and right bank of the Jhelum River on southern side. The main canal namely Jalalpur Canal off - takes from the right flank of the Rasul Barrage, for which provision for the canal Headwork already exists. The main canal with a design capacity of 1,350 cusecs will be about 115.7 km long and traverses along the foothills of salt range.
The distribution system will be about 219 km long comprising of 23 distributaries and 7 minors. More than 730 structures of various kinds will be constructed across the main canal and distribution system A flood carrier network will also be provided to carry saline flood water of hill torrents (debouching over the command area) directly to river Jhelum. In addition, these flood carrier channels may also act as collector channels for any drainage effluent and therefore will be beneficial in reclaiming land affected by surface salinity. 66 Nos. of hill torrents of varying catchment size have been identified during the feasibility study which flow across the project area and ultimately fall in Jhelum River.

Пікірлер
Inside Africa's Food Forest Mega-Project
14:11
Andrew Millison
Рет қаралды 4,1 МЛН
1% vs 100% #beatbox #tiktok
01:10
BeatboxJCOP
Рет қаралды 67 МЛН
Rasul Barrage and Jalalpur Canal Project
14:07
Mrbingopk
Рет қаралды 1,8 М.
3 Nights Onboard US Navy's Largest Stealth Ship
19:52
Not What You Think
Рет қаралды 13 МЛН
How to Make a Real Diamond - (Not Clickbait)
8:51
JerryRigEverything
Рет қаралды 5 МЛН
West Fork Little River Restoration
12:22
Chattahoochee Riverkeeper
Рет қаралды 86 М.
How does a Military Helicopter work?  (Pave Hawk)
18:09
Jared Owen
Рет қаралды 13 МЛН
Kachhi Canal Project |Ramzan and Sons|KC-6B4R |December 2022
4:21
1% vs 100% #beatbox #tiktok
01:10
BeatboxJCOP
Рет қаралды 67 МЛН