New Otaki Expressway - First drive South to North - Open for Christmas Traffic

  Рет қаралды 6,299

Darryl Talks About New Zealand

Darryl Talks About New Zealand

Күн бұрын

Пікірлер: 52
@tkara1980
@tkara1980 2 жыл бұрын
"This new highway massively increases capacity into and out of Wellington, the capital of New Zealand. " I've said it numerous times before, now it's absolutely imperative that the Otaki to North of Levin section be built now. And the gap between that section (connecting to "Wellington, the capital of New Zealand.") and the Cambridge to Piarere section in Waikato (connecting to Hamilton, and further north to Auckland, the largest city in New Zealand) be rapidly closed with a full motorway conversion.
@stuboyd1194
@stuboyd1194 2 жыл бұрын
Google maps says from where the Waikato expressway ends just below Cambridge, to where the Otaki to north of Levin expressway will re-join the existing SH1 is 403 km. I think it will be a very long time before it's 4 lanes all the way between these two expressways. In the mean time, it'd be great to see some viaducts on the Desert Road to eliminate the three sisters bit and that very windy piece of road around the shore of Lake Taupo. There are lots of other places where the existing road could be upgraded or realigned to make it straighter/safer/wider also.
@DarrylTalks
@DarrylTalks 2 жыл бұрын
Yeah, a lot of incremental improvement, or a crazy project build a new highway, Bulls to Turakina, Whangaehu river valley to SH4 to Raetihi. And make the main SH1 go via National park. Make SH4 way better.
@jameshl1137
@jameshl1137 2 жыл бұрын
I dont think a full manawatu through hamilton expressway will ever be feasible (there is just nothing of a population in that space, without veering wildly off to the east), but I would be shocked if they didnt connect levin through to palmy within the next 20 years! And some upgrades on the tourist highway from hamilton to waitomo would be nice.
@tkara1980
@tkara1980 2 жыл бұрын
@@jameshl1137 The issue of population is a "limitation" in getting this done, but I wouldn't stop there. So perhaps encouraging people, industry, etc. to relocate there is the way to go about it. I'm looking at this more strategically and in terms of economic growth and nation building. SH1 between Auckland and Wellington, and everywhere else is used as a major transport and trade corridor. That should never be discounted. As I said before it can be done and it must be done now.
@musicman53
@musicman53 2 жыл бұрын
We’ve just driven it towing our caravan, in torrential rain what’s more, and the bypass and road surface is fabulous. We had no holdups at all, and it was a blast to totally to bypass the Otaki roundabout and Main Street choke point. I drive at 90 kph with the caravan, never faster, and the big rigs on SH1 are always faster than me except climbing hills. Love your videos!
@DarrylTalks
@DarrylTalks 2 жыл бұрын
Yeah, thanks. There has been some real mixed weather lately. So its nice to have some safe reliable roads in the storms.
@crblindis
@crblindis 2 жыл бұрын
Great video again, Darryl. I think a direct road from Levin to Palmerston North needs to also happen along with the Levin extension
@DarrylTalks
@DarrylTalks 2 жыл бұрын
That would be cool! The upgrades of the road that runs through Shannon, over the years, have been making that drive gradually better.
@DragonPhlegm
@DragonPhlegm 2 жыл бұрын
Should do a video in Ōtaki to see how much different it is without a constant queue of traffic at the roundabout
@DarrylTalks
@DarrylTalks 2 жыл бұрын
Yeah, I drove through Otaki today and the traffic on the main street seemed pretty good, about 11am.
@robertrangiuia2613
@robertrangiuia2613 Жыл бұрын
First time I’ve seen this. Thankyou
@srapshooter
@srapshooter 2 жыл бұрын
It's the new North bound Pukarua Bay Home/Holiday traffic merge :D Ohwell, it's the southbound Otaki traffic that was the problem so, at least it fixes that.
@madokariki2726
@madokariki2726 Жыл бұрын
Thanks for your posting. The road looks very wide.
@patrickgriffin536
@patrickgriffin536 2 жыл бұрын
Nice filming and commentary Darryl! Wont be long before the eco zeolots on their push bikes will be trying to claim the left hand lane as their own!!🤠
@ellismatthews5906
@ellismatthews5906 2 жыл бұрын
thanks for that.......,you are right they should just get on with the Otaki to Levin section
@SeniorTuki
@SeniorTuki Жыл бұрын
Great Video thank you. The expressway is designed to accommidate cyclists. The shoulder is wide. Over the Otaki river bridge plates have been installed over the expansion join so bikes don't get caught on it. There are multiple locations which are painted green and signs installed which are to help keep them safe. can been seen at 6:30
@stuboyd1194
@stuboyd1194 2 жыл бұрын
I can't really see much pressure to extend the expressway further than north of Levin for the foreseeable future. Once you get passed Levin, there are numerous state highways and local roads you can use, should the main highway be closed due to any accidents. It's pretty much impossible to be blocked from travelling north of Levin. On the other hand, State highway one north of Mokena Mokere Street in Manakau to Bishops Road in Ohau has NO alternative road if SH1 is blocked. This stretch of highway is 6.2 km long.
@DarrylTalks
@DarrylTalks 2 жыл бұрын
Yeah, I think there needs to be a second route, So the highway to the north of Levin needs to be built for resilience reasons.
@tkara1980
@tkara1980 2 жыл бұрын
Whether there is pressure or not this has to be done now. There's no question about it. A strategic network of motorways and major highways (without private or direct access) in this country should have been put in place long ago or at least laid the groundwork for it. It's good the country is doing something now but it's having to play catchup with other countries whose equivalent systems may have been put in ages ago. On converting the SH1 "gap" to a full motorway that could take 15 to 20 years or less depending on many factors in it. Certain segments of it may have to be tolled. It can be done. People will bring up "limitations" going against that. You get around it or plow through it.
@stuboyd1194
@stuboyd1194 2 жыл бұрын
@@tkara1980 I'm not against extending the expressway further north. If and when it's done, it'll be in stages. I guess the next logical place to extend it to is just north of Foxton, and then after that perhaps to Himatangi or even all the way to Sanson? That could be a long way off however. In the mean time, more passing lanes on the existing SH1 would be a welcome improvement and can be done at a vastly lower cost than a new 4 lane road. Maybe they could aim for passing lanes at least every 20 km? I've always thought that the last uphill before you descend into Mangaweka should be made into a proper passing lane. My two cents worth anyway.
@tkara1980
@tkara1980 2 жыл бұрын
@@stuboyd1194 Actually I believe SH1 from a point "North of Levin" should instead follow a new alignment along current SH57 until south of and to the west of Palmerston North and to the east of Feilding and then along current SH54 until meeting with current SH1 at Vinegar Hill. At least at this time the next project "Otaki to North of Levin" should happen now. Perhaps legislation to speed it up should be enacted.
@stuboyd1194
@stuboyd1194 2 жыл бұрын
@@tkara1980 NZTA says Otaki to North of Levin is supposed to start in 2025. They haven't pinned down when in 2025 that's going to be. It would be great if it started ASAP, as that current road is terrible in places.
@Sweatybusdrivers
@Sweatybusdrivers 2 жыл бұрын
Is it a motorway or are there still safe spaces for bikes and hitchhikers?
@DarrylTalks
@DarrylTalks 2 жыл бұрын
There is a cycleway at the side of the highway on the other side of the plantings, I want to ride my bike up there one day and make a video. There is a separated bike lane on the big bridge. I kind of think the people riding their bikes on the highway are a little bit odd. But I support their freedom to do it. It might be really fun, but it would not be fun for me. Here is a view of the cycle path, that is parallel to the highway kzbin.info/www/bejne/n5e4kIV5p89_hMk
@DarrylTalks
@DarrylTalks 2 жыл бұрын
Another part of the cycleway. kzbin.info/www/bejne/n5e4kIV5p89_hMk
@SnowAndrews
@SnowAndrews 2 жыл бұрын
Now the Holiday weekend (Wellington Exodus) TRAFFIC SNARL-UP will be shifted from Otaki (by the BP), to somewhere around LEVIN !
@DarrylTalks
@DarrylTalks 2 жыл бұрын
I think it will be a bit more free running, because traffic won't build up at the roundabout or pedestrian crossing.
@SnowAndrews
@SnowAndrews 2 жыл бұрын
@@DarrylTalks Also in the Horowhenua~Foxton~ Manawatu~Rangatiki area The Wellington "Holiday Weekend" madness-traffic starts splitting up into West: SH 3/4 traffic, Taupo & North : via SH 1 East: SH57 to SH3-East then SH 2 & SCENIC Meander detour: SH54 until Mangaweka (Through Northern Manawatu) So the total volumes on any specific route TEND to be less.
@nagrom97
@nagrom97 2 жыл бұрын
I think the Cyclists are using the Expressway as the shared path (Cycleway / Walkway) for this project has not been opened yet. It is blocked off in places with fences, so is unusable right now. They needed the new motorway to be fully open for them to be able to finish off the last bits of the shared path in the new year.
@DarrylTalks
@DarrylTalks 2 жыл бұрын
I just guess that the cyclist that are on the road are riding on it "just for fun", because the old road that was only road on Thursday was still there. The person in the pink jacket was clearly a race cyclist, they covered a huge range in a short time.
@jasonhockly8655
@jasonhockly8655 2 жыл бұрын
Much of the crew have moved to work on the Manawatu gorge replacement. O2NL scheduled to start 2025 ... Finish 2029 ... But probably will be 2031 at the earliest.
@DarrylTalks
@DarrylTalks 2 жыл бұрын
Oh yeah, that's good that the people who have skills are remaining doing the thing they know how to do. I guess if the Levin road is started up in the next two or three years, they can move from the gorge road to the Levin road.
@jasonhockly8655
@jasonhockly8655 2 жыл бұрын
@@DarrylTalks much of the bulk earth works is in full stream on the gorge replacement, they should be finished by 2025 and then yeah ... Move to O2NL.
@stuboyd1194
@stuboyd1194 2 жыл бұрын
The Manawatu gorge replacement route is supposed to be finished by the end of 2024. Fingers crossed! I guess the start of O2NL is at least partially dependant on finishing this project. There are aren't enough people, machines or cash to do all these projects simultaneously.
@adrian2984
@adrian2984 2 жыл бұрын
@@jasonhockly8655 the engineers are almost finished the earthworks on the Manawatu tararua highway they should be done by March April. The civil construction and civil drain engineers could be starting that in late summer.
@MarkDonnelly-j9v
@MarkDonnelly-j9v 3 ай бұрын
Hi i like your video
@stuboyd1194
@stuboyd1194 2 жыл бұрын
They were in such a hurry to get it open they didn't remove the "Expressway ends 400 m" sign at 0:37 🚗
@DarrylTalks
@DarrylTalks 2 жыл бұрын
That's hysterical. They could have moved it up 15km, to save money.
@judgev8
@judgev8 2 жыл бұрын
wow Darryl your doing 90ks and getting passed by a car and a ute with trailers,, pretty sure it's an expressway and no riding bike is allowed or horses, walking, hitchhiking, also the passing lane was deleted on Wednesday night and the stupid new speed limit put in
@DarrylTalks
@DarrylTalks 2 жыл бұрын
Well, I guess that the vehicles with trailers should not have been passing me. I had a big rig ahead of me, that I was using for pacing, they would have been driving on exactly 90kmph.
@davidthorne7712
@davidthorne7712 2 жыл бұрын
The lower speed limit (80 kph) north of the expressway ties into the changes that occurred over the past couple of years in the area. It will mean that for the 15km from Otaki to Levin (through Manaku, Kuku, Ohau) the posted limit is constant, therefore should improve traffic flow if people comply. Prior to the opening of this expressway, the old SH1 had the following signage over a distance of 18km (PekaPeka to Manakau) 100-70-50-70-50-100-80-50-100-50-70-50-100-80, the inevitable consequence being frustration and bottlenecks due to the inconsistencies.
@judgev8
@judgev8 2 жыл бұрын
@@davidthorne7712 Hi David yes true only if people "comply" and not do 15-20ks under the 80ks like some do, but would have been nice to flow though from 100ks to 100ks, I drive the stretch of road everyday the frustration of the up and down speed limit was a joke plus the idiots that tailgated big trucks included glad its open now bring on the Levin expressway
@malc334
@malc334 2 жыл бұрын
Cycling is allowed on expressways and prohibited on motorways
@thegreenlandshark6086
@thegreenlandshark6086 2 жыл бұрын
It's a shame I just missed it, I drove through on the way to Auckland on the 20th. Anyway I suspect If National get in at the next election as currently looks likely, they may speed up work on the Otaki to Levin expressway.
@michaelhenry-hurst2787
@michaelhenry-hurst2787 2 жыл бұрын
so how long till it falls apart? less than a year??
@kenw5104
@kenw5104 2 жыл бұрын
2:19 5:56 Wouldn't it be too risky to allow cyclists on a motorway or expressway? Assuming roads aren't scenic structures and if they decided to travel further, rent a car, a bike or something that's appropriate for speed. To me, it's just too dangerous both for the cyclists and drivers.
@tkara1980
@tkara1980 2 жыл бұрын
Yeah I've never did agree with cycling or walking along a motorway (prohibited acts) and motorway-like roads such as this new extension. Big mistakes for this, is along the SH2 Hutt Expressway (Petone to Ngauranga) and the Ngauranga Gorge of SH1. Needs. The gorge is infamous for its narrow, competitive space and uphill climb and downhill descent.
@stuboyd1194
@stuboyd1194 2 жыл бұрын
Here's a video from 2012 showing the proposed PP2O expressway at the time. Interesting to see how a few parts of it were quite different than what was actually built. kzbin.info/www/bejne/f5SZlamclLGbbZY
@DarrylTalks
@DarrylTalks 2 жыл бұрын
I had a watch trough, there are quite a few differences.
@ralphjames1211
@ralphjames1211 Жыл бұрын
Bots Dots
Transmission North South Drive through
27:47
Darryl Talks About New Zealand
Рет қаралды 7 М.
Otaki Expressway North to South First Drive With Otaki Offramp and on ramp
14:49
Darryl Talks About New Zealand
Рет қаралды 3 М.
ВЛОГ ДИАНА В ТУРЦИИ
1:31:22
Lady Diana VLOG
Рет қаралды 1,2 МЛН
I'VE MADE A CUTE FLYING LOLLIPOP FOR MY KID #SHORTS
0:48
A Plus School
Рет қаралды 20 МЛН
Traffic Will Never Be Fixed Here
11:36
Streetcraft
Рет қаралды 697 М.
Why living in Ireland has become impossible
16:29
The Invisible Hand
Рет қаралды 380 М.
Cessna fly over Transmission Gully-Tawa to Otaki.Full length Video.Shot 1/10/21
13:33
Ōtaki to north of Levin preliminary design fly-through - April 2022
9:08
NZ Transport Agency Waka Kotahi
Рет қаралды 40 М.
Why living in Canada has become Impossible
17:01
Hindsight
Рет қаралды 6 МЛН
DRIVING IN LEVIN, NEW ZEALAND [4K] | O.D. WOW
10:36
O.D. WOW
Рет қаралды 4,8 М.
The Real Reason You're Sitting in Traffic
14:00
Streetcraft
Рет қаралды 291 М.
Kenepuru,  Waitangarua, Whitby & Pauatahanui interchanges Transmission Gully
19:41
Darryl Talks About New Zealand
Рет қаралды 3,3 М.
A bird's eye view of the Peka Peka to Ōtaki Expressway
5:13
NZ Transport Agency Waka Kotahi
Рет қаралды 3,7 М.