Koyambedu Market - Virugambakkam metro work shared in this video.
Пікірлер: 20
@pg4832Ай бұрын
🎉🎉 Super Update 🎉🎉
@NambiValavanАй бұрын
Thanks
@sreeagash9126Ай бұрын
Good update bro
@NambiValavanАй бұрын
Thanks
@tuckerbrothers7946Ай бұрын
Good update. Kindly improve video quality.
@NambiValavanАй бұрын
Sure. Will try
@suzyrightly24Ай бұрын
Ithuka kathutu irunthen
@vro667Ай бұрын
Super Coverage of Metro. But please cover the Beach - Egmore 4th line Current Progress. Thanks 😊.
@NambiValavanАй бұрын
Thanks. Will try
@dhanushvenkat3628Ай бұрын
Nice... Vadapalani Orange line station Island Platform? Viaduct has gap like Poonamallee to Porur stretch....
@NambiValavanАй бұрын
Thanks. May be
@FansofcraftingАй бұрын
Yes island platform
@guardiansofgalaxy664Ай бұрын
no way this stretch is going to open before 2027
@saikrishnathiwakarrk26 күн бұрын
This is a chance because after porur stretch planning to open next year all the working labour will work in these routes. Most of the main base laying work is done in some places,so atleast by end of 2027 it will surely be over.
@gouthaman.gopalanАй бұрын
1.08 Koyembedu Market Station 3.25 Natesan Nagar Station Around 5.50 Virugambakkam Station 6.47 Kaliamman Koil on left. New road being formed opposite side for alignment to Arcot road. New road being formed after court case to protect Kaliamman koil and Sundarvardharaja Perumal koil. Kaliamman koil will divide into two one ways at this point
@NambiValavanАй бұрын
I think 6.48 to 6.50 might be Virugambakkam station. But not sure
@gouthaman.gopalanАй бұрын
@@NambiValavan no station at that location. Virugambakkam station was called Ilango nagar at it is located around 5.50 at Ilango nagar. Since residents petitioned name change as Virugambakkam is more popular name was changed.
@gouthaman.gopalanАй бұрын
@@NambiValavan also the pillar spots around Ilango nagar marked as STP meaning Station Pillar