Hi
In this video you will see the reconstruction and warming of another part of the cottage. Self-help, of course.
Today it will be a bit longer, because I tried to use as few accelerated shots as possible, but I still managed to cram a lot of hours of work into a few minutes of video.
I would like to say that this video is not a guide on how to do it right, I actually improvise a lot sometimes.
As you can see, the original wall needed a change. At the same time, we needed to work on insulation so that we would not freeze in the winter like last year.
I started by gradually dismantling the original trim.
As you can see, I improvised a lot with insulation inside, I know, it's not ideal, but it's definitely better than nothing.
Gradually, I leveled the wall with OSB boards.
I prepared the beams, treated them with Lignofix, applied the foaming glue and screwed them on.
I use a Festool BHC cordless hammer drill to fasten the beams.
I glued polystyrene between the beams, and I used foam glue
It did not always work as expected, fortunately there is a foam cleaner.
I also had to create a place for a new window, again I used OSB boards.
Then it was necessary to glue the polystyrene and finish the second layer of lining with OSB boards.
I still foamed all the joints with foam.
I added a vapor-permeable foil to the resulting wall, attached it with an ordinary stapler and attached roof battens to it, which will serve as a grate for the facade floorboards.
I modified the entrance to the cellar a bit,
But as you can see, there is still a lot of work to be done and, like everyone else, I am limited by a lack of funds and time
And finally, I had a little visit in the form of a lizard.
Used tools:
Festool PSC 420 HPC Li 5.2
Festool BHC 18 Li 5.2
Festool CXS 2.6
Woodstar plunge saw (probably no longer in production)
#KutilTom
Instagram: / kutil_tom_cz
FaceBook: / kutil-tom-100421312062080
KZbin: / kutiltom