14:08 those beams are under the EDTP project as part of the 2nd viaduct for Tebrau Highway to accomodate the height of the OHLs, not RTS.
@thebiannualtravellers
@thebiannualtravellers 3 ай бұрын
Ah, ok, I was wondering where else they were going to eract a second set for RTS. Now it makes sense.
@nick_1551
@nick_1551 3 ай бұрын
@@thebiannualtravellers the original Tebrau Highway viaducts were replaced under the EDTP because 1) height too low for OHLs 2) one of the 2 original viaduct was actually more of an underpass with the space of only a single-track, which is likely the reason why that was the first of the 2 to be demolished & rebuilt, in order that the 2nd track can be installed below while this new 2nd viaduct is being replaced, which they are doing now. The 2nd new track is more of less completed already
@abuzek2447
@abuzek2447 2 ай бұрын
I can feel megaproject HSR will be another plan in to do list.
@afizi1213
@afizi1213 3 ай бұрын
13:55 this new bridge is build to go to the rts changar hill?\
@thebiannualtravellers
@thebiannualtravellers 3 ай бұрын
This is the track viaduct to the wadi Hana RTS depot.
@mekvek
@mekvek 3 ай бұрын
How would the truck at 4:50 make a 3-point turn if it wants to go to the opposite direction?!
@thebiannualtravellers
@thebiannualtravellers 3 ай бұрын
It would most likely need to reverse all the way, guided by a worker.
@rolandyeo3619
@rolandyeo3619 3 ай бұрын
Curious what the night illuminations on the bridge will look like?
@thebiannualtravellers
@thebiannualtravellers 3 ай бұрын
O yah, curious about that, too. could be spectacular.
@marktan3668
@marktan3668 3 ай бұрын
Concrete web, cement complex. Very heavy use of cement. Where do they manufacture the cement ?
@ravindrandoraisamy9758
@ravindrandoraisamy9758 3 ай бұрын
After Operational…conduct a drill on how to manage “10000”.. people in the event of a breakdown or system fault..,
@thebiannualtravellers
@thebiannualtravellers 3 ай бұрын
this simulated mass evacuation drill / fire drill is definitely a requirement (in Singapore Context) before the service can commence to test out the egress systems and plans.
@nick_1551
@nick_1551 3 ай бұрын
Such have to be conducted even before operations, in not just an event of breakdown, but also matters of national security like a terrorist attack even in the ICQs
@farhan-5705
@farhan-5705 3 ай бұрын
How does the construction process for the center feature work? (Esp the middle most one that marks the border) Do workers from both countries access to work on the piece?
@thebiannualtravellers
@thebiannualtravellers 3 ай бұрын
Hi, good question, i believe the iron workpiece is delivered from malaysia side, and i saw the delivery of the sky lifts using a barge from the SG side. so i would assume the workers are from both Singapore 🇸🇬 and Malaysia 🇲🇾.
@Iamwhatiam76
@Iamwhatiam76 3 ай бұрын
Hopefully they have plans to extend to Larkin for JB and Yishun for SG
@nick_1551
@nick_1551 3 ай бұрын
No. RTS line is meant to be an entirely separate line for security purposes. We can make new rail connections from both stations, but not an extension of it.
@mtay65
@mtay65 3 ай бұрын
Hope to see completion by end 2025.
@thebiannualtravellers
@thebiannualtravellers 3 ай бұрын
yesss, we are hoping the same. Can't wait to ride on it after following the building process.
@Dragon-gl1rw
@Dragon-gl1rw 3 ай бұрын
After this project is completed, the next one may be the new Causeway to replace the old one.
@afizi1213
@afizi1213 3 ай бұрын
2:05 look how the beautiful concrete they do for rivers
@erictayverystrongimaginati1662
@erictayverystrongimaginati1662 3 ай бұрын
🇲🇾🇸🇬👍✌️🙏
@afizi1213
@afizi1213 3 ай бұрын
3:11 what is this bro
@thebiannualtravellers
@thebiannualtravellers 3 ай бұрын
that is the Viaduct Aesthetic Feature.
@azmiharon8621
@azmiharon8621 3 ай бұрын
Singapura Johor Bahru tidak dapat dipisahkan semakin dirapatkan.Penduduk singapura semakin ramai yang tua tidak produktif pekerja tenaga malaysia semakin juga tidak dapat dipisahkan.Harap duit singapura kekal tinggi
@KeristamingSariSakti
@KeristamingSariSakti 3 ай бұрын
Kalau suatu nanti SGD1=RM0.20 sekalipun KERAJAAN SINGAPORE tiada masalah!!!! Banyak warga China berbondong datang kijer di Singapore yg semakin lengkap public transport smart mereka!!!!
@azmiharon8621
@azmiharon8621 3 ай бұрын
Workers are the same.Different is that no house,less basic needs less electric and water to be use ,since Malaysian workers stay in Johor Bahru plying everyday to Singapore.So it can be said less burden to Singapore than workers from other countries that have to stay in Singapore making more crowded to Singapore enviorement and surrounding houses or flats ang public transport
@hatihitam5724
@hatihitam5724 3 ай бұрын
7:30 TMJ COMING
Latest December 2024 Updates on the RTS Link Singapore and Johor Bahru
10:26
The Biannual Travellers
Рет қаралды 9 М.
Cheerleader Transformation That Left Everyone Speechless! #shorts
00:27
Fabiosa Best Lifehacks
Рет қаралды 14 МЛН
黑天使被操控了#short #angel #clown
00:40
Super Beauty team
Рет қаралды 54 МЛН
Каха и дочка
00:28
К-Media
Рет қаралды 1,9 МЛН
Singapore Got Crazy Rich. But at what Cost
14:44
The Invisible Hand
Рет қаралды 187 М.
RTS Link Nov 24 Update: Malaysia & Singapore’s Game-Changing Connection!
21:53
SCM Southern Corridor Malaysia
Рет қаралды 159 М.
Singapore 🇸🇬 in 4K ULTRA HD HDR 60 FPS Video by Drone
12:03
Exploropia
Рет қаралды 2,1 МЛН
How I Created My Own UFO When I Saw It in My Dreams
1:01:19
Thánh Chế - Mr Hồ
Рет қаралды 23 МЛН
RTS Link Johor Singapore (December 2024)
8:45
SG Yap
Рет қаралды 23 М.
Riding the Japan's Fastest Bullet Train l HAYABUSA First Class Seat 🚄
28:11
Cheerleader Transformation That Left Everyone Speechless! #shorts
00:27
Fabiosa Best Lifehacks
Рет қаралды 14 МЛН