Hey! Great video. My meter shows 2.8.2 T1 = 284 units. I don't see any settings for T2 units. Can you guide a bit, please?
@muhammadaftabmughal24512 ай бұрын
Very good information sir ❤❤❤❤❤
@salesservices141627 күн бұрын
MashaAllah doing best, pls suggest what are the timings for peak and off peak. So we can control peak hour units and work as per sequence to manage over billing in term of cost.
@cognitiveacademy660127 күн бұрын
JazakAllah...let me share a video on that
@faisalghafoor5243Ай бұрын
Which menu shows instant import or export
@BilalAhmed-bi1lwАй бұрын
Thanks for the valuable information, please tell how could we get the net unit after imports and exports
@cognitiveacademy6601Ай бұрын
That you can see in your bill
@cognitiveacademy6601Ай бұрын
I have also uploaded a video where you can learn how to calculate your net metering bill...
@Aqeel-d8s2 ай бұрын
AOA , I am Aqeel from Islamabad. I want some guidance from your good self about the following: I am a user of Solarmax Onyx Series Dual PV 9000 (Single phase) Installed in December 2022 with NetMeeting (green Meter). Now IESCO has changed the Green meter with New AMI Meter (three phase). Is the above said Inverter compatible with New AMI Meter? Because New AMI Meter is showing a double daily consumption against the daily consumption of the previous green meter. For Example our daily consumption was 22-23 Units in off peak hours while now daily consumption is 45-46 units as per New AMI Meter. Please guide this matter, I am very grateful to you. Regards,
@cognitiveacademy66012 ай бұрын
Wslam brother, As per SOPs and NEPRA rules only three phase inverters (On-Grid/hybrid) are allowed for net metering. But nonetheless let me answer your question.
@tahirhabib32132 ай бұрын
Plz disable export settings from the inverter until your new AMI bidirectional meter is active for solar. Active meter shows 1.8.x and 2.8.x codes.
@cognitiveacademy66012 ай бұрын
I think a single phase inverter would work with a 3 phase AMI meter as we have not received any such complaint. There are many who are using a single phase inverter though it's not allowed. As far as your daily consumption is doubled that could be an internal issue otherwise lodge a complaint to your sub division office.
@jawwadsubzwariАй бұрын
After installation of solar system, Ami meter has been installed. Please advise if they come BI-DIRECTIONAL enabled. I can't see the export menu on the meter. Should I use the system assuming that the export is being recorded at the back end or wait till it is bi direction enabled and starts showing me the export menu. Thanks
@cognitiveacademy6601Ай бұрын
You need to get them enabled from the sub division office. Usually they do it at the time of MCO feeding. Nonetheless your export units are being recorded from the moment it was installed.
@Aqeel-d8s2 ай бұрын
AOA, In AMI Meter (Solar Consumer) OBIS code 15.8.0 is used for total Import and export units (combined units) While 1.8.0 for total import and 2.8.0 for total export? Please advise
@cognitiveacademy66012 ай бұрын
15.8.0 code OBIS me bi-directional meter kliye nhi ha...bqaya ap bilkul sahi smjhay hain...
@muhammadaftabmughal24512 ай бұрын
❤❤❤
@shoaibidrees1542 ай бұрын
Salaam brother can u please clarify what is reactive energy and maximum demand?
@cognitiveacademy66012 ай бұрын
Wslam. Reactive power is basically power which is consumed in capacitive or inductive load and measured in VARs. It doesn't do any real work. While actual power is the power which does real work and is measured in KW. Maximum demand is the maximum demand in KW consumed by the consumer over a period of time.
@cognitiveacademy66012 ай бұрын
Aik consumer aik month me sb se ziada jo load istemal krta ha wo MDI se pta chal jata ha.... Mtlb koi aisa waqt aata ha k jab consumer tmam load on krta ha..wo record ho jata ha....
@shoaibidrees1542 ай бұрын
@@cognitiveacademy6601 okay thanks brother
@shoaibidrees1542 ай бұрын
Thankyou for help and this info
@cognitiveacademy66012 ай бұрын
@@shoaibidrees154 JazakAllah...need your support
@muhammadaftabmughal24512 ай бұрын
Assalam alekum sir اے ایم ائی میٹر کی تمام ریڈنگز پر ایک تفصیل ویڈیو بنا دیں تو مہربانی ہوگی اپ کی شکریہ جناب ۔۔۔۔
@muhammadyasir3975Ай бұрын
All AMS meters either single phase or three phase, are Bi Directional
@cognitiveacademy6601Ай бұрын
Yes....
@cognitiveacademy6601Ай бұрын
But for net metering in Pakistan only three phase bidirectional meter is allowed
@fauziakarim8579Ай бұрын
AOA. Mera green net meter 2 month use kay baad jal gya. IESCO nay def-est code laga kar pichlay saal kay units ka bill bana kar bhej diya. Kuch din baad naya AMI meter lag gaya. Kiya mujhe iss naye AMI meter kay paisay dene paray gai? Kiya naya demand note chahiye hota hai? Please jawab zaroor dein. Shukriya
@cognitiveacademy6601Ай бұрын
Nhi...iss k pese nhi dene pren ge ..free change ho rhy
@fauziakarim8579Ай бұрын
Thank you so much
@anjumghan12 ай бұрын
Aoa my green meter is replaced with Ami meter but it is not showing the code 2.8.2. I understand that it is not exporting the excess units. How can I check whether it is a simple 3 phase meter or it is a bi-directional meter. Thanks
Wslam... kindly watch this video...you will see the Extra segments enabled. If not then just contact your sub division office and get them enabled..
@anjumghan12 ай бұрын
Thanks
@Homestead_Pakistan2 ай бұрын
@@cognitiveacademy6601Brother aap ka number mil skta hai? Bill may MDI bohat high i hue hai us say related baat karni the
@saabspainwala2 ай бұрын
Sir gepco ami meter different hai us per bhi video ban please kiase read kar skte hai thanks
@arshadalisabir79022 ай бұрын
Kindly explain the readings against the following codes in Ami 3 phase meter. 15.6.0 15.6.1 15.6.2 Kya yeh import units Hain Ya export units hain Ya total cumulative units Hain Kindly easy way MN smjha den Shukriya
@Noname-jv2lh2 ай бұрын
Rawalpindi mai single phase ami meter pe net metering ho sakta hai?
@cognitiveacademy66012 ай бұрын
Nhi..just three phase
@syedzulfiqarhussain92202 ай бұрын
Sir iesco replaced green meter with Ami meter The obis code is not appearing in my meter only 15.8.8.1/2/0 is coming
@cognitiveacademy66012 ай бұрын
Aa jayen ge wo bhi...enable hon ge
@1234strange13 күн бұрын
Assalamualaikum WarahmatUllah Wabarakatuho kindly send me obis file
@IjazMohammad-s2cАй бұрын
Is it any app for this meter?
@cognitiveacademy6601Ай бұрын
Not yet launched
@nomanmalik5775Ай бұрын
3 phase ami meter solar py chal rha ha connection wali light blink krti ha jab k dsry meter ki connection wali light still rehti ha is ka kia matlb ha??
@cognitiveacademy6601Ай бұрын
Will check and let you know
@ghanikhan6594Ай бұрын
My Ami 3 phase meter is showing export energy 12881 for T1 and 12882 for T2, not showing 281 or 282 Please confirm is that ok??
@cognitiveacademy6601Ай бұрын
Do you have the same AMI meter?
@ghanikhan6594Ай бұрын
Yes same
@ghanikhan6594Ай бұрын
@@cognitiveacademy6601yes its same meter
@cognitiveacademy6601Ай бұрын
If it's the same one then i think export segments are not enabled yet. OBIS codes are universal and should be same in any meter. But there are some local meters where the codes might differ.
@uniquesolarАй бұрын
Current export abi kitne ho rahi ha wo kis number pa check kr sakty han. Jasy green meter ki 30 number reading the.
@funmediatv7398Ай бұрын
Aoa bro mera solar 10kw ka or inverter ny 5days mein 250 bana a hn...but ami meter per 194 show ho rhh hn...setting 2.8.2 wali mein....
@cognitiveacademy6601Ай бұрын
Inverter pe different hi hon gi... pehlay ap k ghr me use hoti ha..uss se izafi wapda ko export hoti ha
@hamidiftkharcheema1487Ай бұрын
AMI meters lesco main b lgyen gye?
@cognitiveacademy6601Ай бұрын
Ye IESCO me lag rhy hain....but tmam discos me hi AMR meters aa rhy hain aahista aahista
@muhammadasifali3608Ай бұрын
Kindly send the OBIS code file. Is it possible to use new AMI single phase meters for net-metering.
@cognitiveacademy6601Ай бұрын
Send me email address
@cognitiveacademy6601Ай бұрын
No only three phase is allowed
@1234strange13 күн бұрын
Assalamualaikum WarahmatUllah Wabarakatuho kindly send me obis file
@multynational10472 ай бұрын
بھائ جو میٹر ami GSM سم والا میٹر پہلے سے لگا ہوا ہے۔ USAID والا اس کو نیٹ میٹرنگ کے لیے استعمال کیا جا سکتا ہے۔ اگر کیا جا سکتا ہے تو کیا طریقہ ہے۔
@cognitiveacademy66012 ай бұрын
Abhi jo new aa rhy hain in sb me ye feature available ha..chahy single phase ho ya three phase...USAID ka jo purana meter ha uss ka confirm krna pre ga.... Me confirm kr k apko btata hun
@kingworld2756Ай бұрын
Very poor explanation. Confused and ambiguous
@ShadranAftab2 ай бұрын
Salam Mera AMI meter Laga ga 1 Hafta pehle solar installer Keh Raha k MCO activation khud ho jae ga wait for First bill ye 158.8.0 ki reading backend pe segregate ho Rahi hai bus AP ko show nai ho Rahi.
@ShadranAftab2 ай бұрын
I also notice that the reading on 158.8.0 is the total units of export + import
@ShadranAftab2 ай бұрын
Kindly guide
@cognitiveacademy66012 ай бұрын
Yes.... export units apki record ho rhi hain....show after MCO feeding ho jayen gi... segments enable ho jayen ge
@ShadranAftab2 ай бұрын
@@cognitiveacademy6601 thanks is ka Matlab mei easy ho k electricity use kar sakta hon mere export units waiste nai ho Rahe
@cognitiveacademy66012 ай бұрын
In the video i explained the segments....please watch again
@tariqmehmood-xe8xsАй бұрын
please send code list.
@cognitiveacademy6601Ай бұрын
Send me your email address
@mhernaveed166721 күн бұрын
Sir 3 phase Ami meter has installed on my house made by kbk company. I have update it bi directional by requesting to SDO and now the aeros aprears but codes are not shown. SDO said in this kbk made meter only aeros aprears rather than codes. So please tell us where I read my export and import units in *kbk* 3 phase meter
@cognitiveacademy660121 күн бұрын
Ok noted
@mhernaveed166721 күн бұрын
@@cognitiveacademy6601 sir please tell us mention numbers for export and import units on kbk company made Ami 3 phase meter as I early asked where only aeros shown rather that bois
@amansubhani8672Ай бұрын
Bajli wasy he nahi hoti ab Network nahi ho ga to bajli be gahb hoo jay ge..... Electric waly boly gay Network ka issue hay, net work waly boly gay Electric ka issue hay..... Ya ALLAH Raham farma Pakistan ko mazad tuba hony say
@cognitiveacademy6601Ай бұрын
Could be an issue
@saabspainwala2 ай бұрын
Sir gepco ami meter different hai us per bhi video ban please kiase read kar skte hai thanks
@cognitiveacademy66012 ай бұрын
Bna dun ga insha'Allah
@saabspainwala2 ай бұрын
Thank you sir microtech R326_DTGC3 model ka model hai jo mere ghar per instal huwa @cognitiveacademy6601