steam turbine operation,steam turbine control,control of over load or under load on generator with governor,طرق التحكم فى توليد الكهرباء بناء على طلب الاحمال على الشبكه الموحده
Пікірлер: 11
@richardevans95303 жыл бұрын
Excellent overview! Nice work!
@deependrakumargautam83495 ай бұрын
Ultimate Video Series
@erfgtdsfsdf69935 жыл бұрын
thanks for all vids
@rpdetablan73Ай бұрын
👍👍👍
@mohammadbakhtiarinejad8203 жыл бұрын
So nice👌👌
@Sonbkav972 жыл бұрын
thank sir
@pajoohesh89163 жыл бұрын
Great Job and deserves appreciation. Do you have the instructor book from L& K for the videos?
@allegrajones62393 жыл бұрын
I agree with your comment. What does L&K stand for?
@deikuzan75644 жыл бұрын
Great video but I dont undertand in this part 01:38, this this image I saw 2 inlet that is from side and from bellow. Is that arrow above "to steam turbine" is in wrong direction (must be reversed from up to down) ? Thx
@bugginryan3 жыл бұрын
The steam would be running axially from where the arrows are pointing through the first stage nozzle block.
@umairabbasi63 Жыл бұрын
Is there any book explaining steam turbines and generators and governors?