Hi sir...in startup time some RPM approximately 600 rpm ecentarcity come to zero... after synchronisation also it will showing zero...sir i am working in two different plant both are Danogfang turbine one is 150MW and other one is 135MW...in 150 MW eccentricity showing zero after 600 rpm to upto nornal operations...but in 135 MW Danogfang turbine in running operations eccentricity showing 63 microns...my humble request is please share your knowledge on above matter.
@kpatelbla8 ай бұрын
Please join my next live session for detail explanation
@exhaustedhumanoid_9 ай бұрын
Why do we close the lube oil cooler inlet and outlet from the water side when turbine tripped
@kpatelbla9 ай бұрын
To maintain Turbine lube oil temperature so oil quality will maintain
@exhaustedhumanoid_9 ай бұрын
@@kpatelbla sir I didn't understand the logic why from water side and does it affect the LOP and this I wasn't seen it it supercritical unit but why in sub critical unit like 150MW
@kpatelbla9 ай бұрын
@exhaustedhumanoid_ actually Lube oil temperature recommended by OEM (Original Equipment manufacturer) is 45 to 49 degree but in case of Turbine trip if you don't isolate lube oil cooler it drops below recommended value so your turbine might be standstill condition means out of barring due to low temperature of Lube oil which is extremely avoidable. I think you get it.
@exhaustedhumanoid_9 ай бұрын
@@kpatelbla ok that I understood but lube oil for lubrication purpose so in tripping time how could be temp drop fast as the average rotor temp more than 150 and it takes 16-18hr to come atmospheric temp. So why do we isolate the lube oil cooler from water side just after the turbine trip
@kpatelbla9 ай бұрын
@exhaustedhumanoid_ actually when Turbine on load there is more heat generated in bearing as compared to unload condition.
@amitpaswan88148 ай бұрын
Barring valve open only after generator sealing
@0503manoj9 ай бұрын
Sir Oil spray test kaise karte hai 600 mw bhel unit me... Please explain Step by step process sir
@kpatelbla9 ай бұрын
Will make separate video.
@0503manoj9 ай бұрын
@@kpatelbla ok thanks lot sir
@sawansingh74909 ай бұрын
Sir cold rolling mai gland sealing kab dete hai after hoggar yaa before hoggar.
@amitpaswan88148 ай бұрын
HPLP Bypass charge karne se pehle
@madhugolivlogs8 ай бұрын
60 mw 135 mw 600 mw diffrents operation
@0503manoj9 ай бұрын
Sir If decrease the pressure ratio of hp and lp then after what will be happening of turbine operation.
@kpatelbla9 ай бұрын
Normal running condition pressure ratio is indication of utilization of steam energy.
@pavanshahu4599 ай бұрын
Self sealing kaise hota hai aur seam ka parameters kitana hota hai
@kpatelbla9 ай бұрын
Self sealing takes place above 60% of Unit load by Gland leakage steam of HP and IP turbine.
@rajkumargupta95182 ай бұрын
Sir good morning Sir boiler commissioning ka video upload kijiye 660 mw
@worldinstrumentationengineer9 ай бұрын
I have a question, DPU backup process of MAXDNA DCS
@kpatelbla9 ай бұрын
There is an standby DPU
@0503manoj9 ай бұрын
Sir One more question please explain main turbine me eccentricity nahi show karta hai but TDBFP me eccentricity show karta hai kyu....?
@kpatelbla9 ай бұрын
Actually Eccentricity is important parameter upto 2850 RPM then after it is not very important to monitor TDBFP design to operate various speed so it is provided in TDBFP.