LPS Structure Demolition Engineering

  Рет қаралды 263

Andun Engineering Consultants

Andun Engineering Consultants

Күн бұрын

Overview of demolition engineering required for LPS structures
Key Highlights:
In-Depth Analysis of LPS Structures: Understand the construction, risks, and historical context of Large Panel System buildings, with an emphasis on why detailed planning is crucial for their safe demolition.
Coventry Point Case Study: A comprehensive look at the demolition process for Coventry Point, showcasing pre-demolition assessments, risk mitigation strategies, and the execution of public safety measures.
Demolition Methodologies Explored: Explore various techniques for top-down demolition, including the use of cranes and high-reach excavators, and learn why the design of temporary works is fundamental to ensuring a safe demolition process.
Safety and Mitigation Strategies: Discover the strategies implemented to prevent structural instability, manage demolition debris, and protect the public from potential hazards during the demolition of LPS structures.

Пікірлер
Propping and Needling - Design Considerations and Case Studies
47:31
Andun Engineering Consultants
Рет қаралды 466
Prestressed and Post Tensioned Demolition - Overview and Case Studies
40:36
Andun Engineering Consultants
Рет қаралды 759
English or Spanish 🤣
00:16
GL Show
Рет қаралды 18 МЛН
Medieval Engineering - Lessons For Temporary Works and Demolition Industry
30:50
Andun Engineering Consultants
Рет қаралды 290
Chocking Frames, Tower Cranes & Grillages - Leadenhall One Case Study
33:13
Andun Engineering Consultants
Рет қаралды 429
Re:Builders Information & Taster Session
1:24:39
CIVIC SQUARE
Рет қаралды 59
Temporary Works For Demolition
49:51
Andun Engineering Consultants
Рет қаралды 157
Bridge Demolition Engineering & Case Studies
43:57
Andun Engineering Consultants
Рет қаралды 162
Temporary Works for Construction Industry
57:46
Andun Engineering Consultants
Рет қаралды 752
WORKSHOP WEDNESDAY: StuG III transmission disassembly!
20:34
The Australian Armour & Artillery Museum
Рет қаралды 87 М.
What Voyager Detected at the Edge of the Solar System
51:03
Astrum
Рет қаралды 1,3 МЛН
Temporary Works and Demolition Case Studies
38:20
Andun Engineering Consultants
Рет қаралды 355
Fire Safety in Construction-Part 1
1:37:17
J Mohammadpour | PhD
Рет қаралды 5