Massive Contaminated Hanford Vault Moved Away from Columbia River

  Рет қаралды 16,081

HanfordSite

HanfordSite

10 жыл бұрын

On February 14, 2014, the Department of Energy's (DOE's) Richland Operations Office announced the removal of a massive concrete vault that once held two 15,000-gallon stainless steel tanks used to collect highly contaminated waste from Hanford's 300 Area laboratories as part of the River Corridor Closure project.
"The removal of the vault is another big step in cleaning up Hanford's fuel fabrication and research and development facilities that supported the Cold War effort," said Mark French, DOE Federal Project Director for the River Corridor Closure Project.
The vault weighed 1,153 tons, or 2.3 million pounds, and is the second large lift completed in the 300 Area. The first lift was completed last month, when a 1,082-ton Plutonium Recycle Test Reactor was removed. The vault removal was completed by Washington Closure Hanford, the contractor for the River Corridor Closure project.
Used during the site's plutonium production days to retain highly contaminated liquid from various facilities within the 300 Area, the vault measured 40 feet long, 29 feet wide and 25 feet high. The 340 vault was secured and packaged on a high-payload-capable Goldhofer trailer for transport to the Environmental Restoration Disposal Facility, Hanford's onsite landfill for low-level mixed waste.
The River Corridor is a 220-square-mile section of land bordering the Columbia River and is DOE's largest environmental cleanup closure project. The 300 Area is located about a mile north of Richland and a quarter-mile from the Columbia River. It was home to Hanford's research, development and fuel fabrication activities for nearly 60 years.
For additional information on the Department of Energy's Office of Environmental Management and on the Hanford Site, visit www.em.doe.gov or www.hanford.gov.
**Photos of the 340 Vault can be viewed and downloaded at: www.hanford.gov/c.cfm/photogal...
B-roll video of the 340 vault being prepared for removal can be seen here: • B-Roll of 340 Vault Pr...
###

Пікірлер: 8
@RiDankulous
@RiDankulous 2 жыл бұрын
You are doing good work!
@greenlawnfarm5827
@greenlawnfarm5827 Жыл бұрын
Yes! They removed it and put it in an environmental site so now it is safe and not dangerous.
@amphilex
@amphilex 10 жыл бұрын
nice job
@BornRandy62
@BornRandy62 7 жыл бұрын
2 parts of my favorite duty assignment will live forever at the Hanford site. reactors from USS South Carolina CGN 37
@19eightyforeisnow
@19eightyforeisnow Жыл бұрын
What do these guys get paid? I'm assuming it's davisbacon prevailing wage but what is it 150-200$hr ?
@bobl78
@bobl78 10 жыл бұрын
what is the final goal of the hanford cleanup ?They want just soil and nothing else there or will there always be some Kind of nuclear left overs?
@randgate
@randgate 7 жыл бұрын
Always some kind of left over, their just trying to stop (any more than has already) getting into the drinking water. Most of the waste remains on site, since Yukka stalled.
@LolUGotBusted
@LolUGotBusted Жыл бұрын
depends on the half-life. generally speaking half-life times ten degrades anything radioactive to harmless levels.
The Hanford Story - Plutonium Finishing Plant
8:57
HanfordSite
Рет қаралды 395 М.
U Canyon Deck Being Cleared
3:15
HanfordSite
Рет қаралды 7 М.
ТАМАЕВ УНИЧТОЖИЛ CLS ВЕНГАЛБИ! Конфликт с Ахмедом?!
25:37
A clash of kindness and indifference #shorts
00:17
Fabiosa Best Lifehacks
Рет қаралды 77 МЛН
The Hanford Story: Groundwater
5:23
HanfordSite
Рет қаралды 30 М.
Massive Test Reactor Removed
2:19
HanfordSite
Рет қаралды 4,8 М.
The Hanford Story:  Tank Waste Cleanup
8:38
HanfordSite
Рет қаралды 30 М.
REAL PLUTONIUM
16:45
Periodic Videos
Рет қаралды 11 МЛН
Queen Mary of the Desert
2:34
AtomicHeritage
Рет қаралды 26 М.
Hanford Vit Plant Drone Footage
1:30
HanfordVitPlant
Рет қаралды 3,2 М.
Prepping to Enter One of Hanford's Most Hazardous Rooms
6:37
HanfordSite
Рет қаралды 54 М.
Preparing to Enter One of Hanford's Most Hazardous Rooms
6:37
CH2M HILL Plateau Remediation Company
Рет қаралды 16 М.
Plutonium Fuel Fabrication
10:09
Nuclear Engineering at Argonne
Рет қаралды 104 М.
Choose a phone for your mom
0:20
ChooseGift
Рет қаралды 7 МЛН
ГОСЗАКУПОЧНЫЙ ПК за 10 тысяч рублей
36:28
Ремонтяш
Рет қаралды 281 М.
Todos os modelos de smartphone
0:20
Spider Slack
Рет қаралды 36 МЛН
تجربة أغرب توصيلة شحن ضد القطع تماما
0:56
صدام العزي
Рет қаралды 54 МЛН