Massive Watermain Pressure Reduction Valve (PRV) chamber installation in Vancouver

  Рет қаралды 603

Complete Utility Contractors

Complete Utility Contractors

Күн бұрын

Measuring 20 ft. long, 15 ft. wide, and 10 ft. deep, and weighing over 70,000 pounds, this large concrete pressure reduction valve chamber was hoisted into place with a 250 metric tonne crane and will be tied into Metro Vancouver’s 1800mm water pipeline.
Our team of excavation specialists executed a geotechnical-engineered shoring plan. A 24 ft. by 10 ft. engineered cage with 16ft spreaders, as well as heavy lift plans and tag lines, were used for safe manned entry.
Once the chamber is fully installed, the backfill begins and the external pipework will start, followed by pressure testing and chlorination prior to our Metro Vancouver tie-in procedure.
www.completeut...

Пікірлер
How deep can an excavator dig?
2:28
Complete Utility Contractors
Рет қаралды 599
We Test 3 Ways To Set A Fence Post (1 Winner)
22:23
SWI Fence
Рет қаралды 1,1 МЛН
iPhone or Chocolate??
00:16
Hungry FAM
Рет қаралды 55 МЛН
AVK Combi Flanges Installation Animation
2:27
AVK Australia Holding Pty Ltd
Рет қаралды 265 М.
Hot Tapping Water main
4:04
Joe Rock
Рет қаралды 106 М.
Drilling Piers on Mabank Texas Home
1:19
Pope Company Custom Homes, LP
Рет қаралды 167
Mechanical Batteries: The Future of Energy Storage? | FD Engineering
51:34
Free Documentary - Engineering
Рет қаралды 394 М.
Edward Snowden: How Your Cell Phone Spies on You
24:16
JRE Clips
Рет қаралды 18 МЛН
OSINT At Home #9 - Top 4 Free Satellite Imagery Sources
13:21
Bendobrown
Рет қаралды 1,6 МЛН
I Toured JerryRigEverything's Factory!
18:41
NothingButTech
Рет қаралды 208 М.
How City Water Purification Works: Drinking and Wastewater
12:26
Animagraffs
Рет қаралды 749 М.
Sanitary Sewer Separation in Vancouver
1:15
Complete Utility Contractors
Рет қаралды 586