For the last constraint in the last problem, should it not be 4(x1 +x2 +x3)
@ShoaibHussain-dh4vd4 жыл бұрын
The problems are quite entertaining btw :)
@Alfa1M4 жыл бұрын
Good Job! From Ethiopia
@yashvaibhav95463 жыл бұрын
Problem mentioned in 6:00 mentions "the weight in each hold must be propotionL to the capacity in tonnes". I think we have not taken this constraint into account while forming LPP.
@MathPod3 жыл бұрын
It's considered, Constraints shown in third column address to weight.
@radicalpotato666 Жыл бұрын
I agree.
@harma18252 жыл бұрын
Mam problem at 12:45, can't the hours be broken down into 1 hr period instead of 2 hr period? The problem states that part-time workers can start anytime between 9 to 1pm. It doesn't mention that workers must start at 2 hr period. So starting time could be considered continuous instead of discrete values of 9am, 11am, or 1pm?
@blue678392 жыл бұрын
But the shift is already divided..... Workers can't start in between shifts... That would be chaotic and need more unnecessary management..... Atleast I think so
@rishitjakharia9730Ай бұрын
@@blue67839 I meann... they are clearly leaving for lunch at 12.. and some are joining after lunch which is 2. I feel the problem would be better contained if the equations were on an hourly basis rather than 2hrs..
@harma18252 жыл бұрын
Mam, from which book are the screenshots taken? And from which book online students of UMA035 practice if required?
@girikgarg8 Жыл бұрын
Nicely explained ma'am
@ShoaibHussain-dh4vd4 жыл бұрын
if part time hours are limited to 50%, then 4(x1+x2+x3)
@80Satpal Жыл бұрын
I liked the approach you have taken, considering the 1 hour of lunch, the constraint should be; 4(x1+x2+x3)
@saumyashah66223 жыл бұрын
Sometimes we are considering decision variable as unit of volume, sometimes unit of weight,... what exactly are we taking as a decision variable. I rewatched the decision variable video but can't understand. Can you please help me with my doubt ??
@MathPod3 жыл бұрын
If it is about a specific problem, let me know the timeline in video. In general, decision variables are decided as per problem, there are no fixed strategies. We look for answering "WHAT is being made-manufactured/cost/profit associated with .." and accordingly allocate this as variable. The available capacities/Demand help us to create constraints.
@kunalkrantidas64424 жыл бұрын
Thank you for the detailed explanation. I have a doubt regarding Total hours required each day which is used in the last constraint. Total hours required each day= (32+40+35+33) or 2*(32+40+35+33) which one of the above is correct?
@MathPod4 жыл бұрын
Total hours required each day is (32+40+35+33) and then take 50% of total hours as asked in problem.
@kunalkrantidas64424 жыл бұрын
@@MathPod Lets say if we consider 9am-11am slot, then total workers needed are 32 and they work for 2hours...Hence total working hours will be 2*32=64. Is it correct or am I missing something?
@MathPod4 жыл бұрын
@@kunalkrantidas6442 total working hours are 32 as given in problem but not 64. We cannot assume that working hours are for one hour.
@yashvaibhav95463 жыл бұрын
@@MathPod But the question says 32 workers are needed for time period 9-11, so 32 workers will do 64 hours of work in 2hrs time.
@sachi76962 жыл бұрын
@@yashvaibhav9546 yes
@puspaulmukhopadhyay7794 Жыл бұрын
mam , how can amount and weight have the same unit ( or dimension ) ,you represented both using same variable .
@luvkushmudgal82644 ай бұрын
the amount is weight itself. the amount is representing the weight of the commodities.