Рет қаралды 22,080
The product is a high density particulate chemical.
In order to remove a leak that has emerged in hot and cold water lines, which we call as clean water, it is applied to a closed system with a pressure test pump.
The bottle must be shaken before application. All water inlets and outlets should be closed, including water meter valves belonging to the residential area.
If there is a leak in the hot or cold water line, it is detected.( Our practitioners use this test pump and acoustic sound listening method.)
Product usage according to leak size is performed. MB FLEX is injected into the installation with the help of a pressure test pump connected to the tap/waterline. MB FLEX, which is injected into the system, reaches to the point of leakage thanks to the applied pressure and stops the pressure drop caused by leakage in a short time and repairs the leakage. When the barometer stops moving, it means that the product has found a leak of particles. In the water mains varying from 4 to 7 bar, a maximum of 12 bar pressure can be applied. In order to achieve a permanent effect, the system should be locked at a minimum of 8 bar pressure and the chemical must be waited for 24 hours to complete the repair. The product starts to crystallize in at least 24 hours. For this reason, water contact should not be made for at least 24 hours. Valves should not be opened.
The product is disposable. It should be consumed as soon as it is opened. Within one year, free support is provided if there is a problem with the repair.
*Personal protection equipments is necessary.
• PLEASE READ ON THE PACKING BEFORE PRODUCT APPLICATION AND WARMING