Assalam O Alaikum brother Please explain how to determine working platforms in accordance with total planks levels in light and medium duty scaffolds I cannot still understand the formula to calculate the working platforms according to total planks levels JazakAllah khair
@MDAFZALHSECLASSАй бұрын
kzbin.info/www/bejne/apaQiZaNm8R2Z7c You can watch by above link for your answers
@sampathsanjeewa4383Ай бұрын
Sir what kind of hitch will be use rope not comeback from the gin wheel?
@MDAFZALHSECLASSАй бұрын
Figure eight knot
@sampathsanjeewa4383Ай бұрын
@MDAFZALHSECLASS thanks sir
@JakirHossain-x7eАй бұрын
# Who will inspect system scaffolding above 6 meter? (A) S-II. (B) T-II. (C) S-I. (D) inspector.
@sathifun3123Ай бұрын
2S
@JakirHossain-x7eАй бұрын
If the scaffold has maximum load rating 170 kilograms per square meter? (A) Light duty (B) Medium duty (C) Special duty (D) None of the Above.