Рет қаралды 555
Now when we are done with the boulder wall, we are building a smaller garden wall between the house and the coming garage. This wall is needed, because there will be about 60cm of height difference between the garage level and the house. We also built in some stairs to make the garage accessible.
When the wall is finished, we do the drainage to the garage and level it off with gravel.
At the end you can see our finished result of this job =)
The machine used is a Mecalac MTX12 with Engcon ec214 Tiltrotator & Dalagripen Grapple.
The songs are from Epidemic Sound. If it's not your jam, you're welcome to mute and watch with your own favorite playlist. Enjoy!
Thank you for watching! Subscribe to follow me at work✌️