Method for using Discharge Rod in Hindi

  Рет қаралды 557,248

Vikas Jha

Vikas Jha

5 жыл бұрын

A discharge rod is used to ground the extra current in railways / Metro

Пікірлер: 135
@2flyingbirds293
@2flyingbirds293 3 жыл бұрын
Proud to be Electrical Engineer
@thetenderloins6564
@thetenderloins6564 2 жыл бұрын
Same here mate
@electricalengineertrainee1929
@electricalengineertrainee1929 2 жыл бұрын
मैं भी इलेक्ट्रिकल इंजीनियर पल गर्व महसूस कर रहा हूँ
@sachinbangade9371
@sachinbangade9371 2 жыл бұрын
Aap bhi seamens me ho kya
@hiteshkumar882
@hiteshkumar882 3 жыл бұрын
Very good idea used by you l like your job.
@vairagijayesh
@vairagijayesh 3 жыл бұрын
Bahot sahi hai bhai.. Keep rocking.. Thank t
@GBR_LifeLineoftheNation
@GBR_LifeLineoftheNation 3 жыл бұрын
Excellent video 👌
@ManvirSingh-wl9ou
@ManvirSingh-wl9ou 3 жыл бұрын
@Vikas Jha....Vikas ji please tell me one thing....agar starting mein you said k copper wire valey conductor portion ko haath nahi lgana... what's the reason ?? Because insulation of this Single core conductor cable used is also not meant for 11kV....I hope you follow my point.... myself a Distribution Engineer from PSPCL...we really appreciate your efforts....Great Job Sir.
@gulwantsingh8806
@gulwantsingh8806 3 жыл бұрын
बहुत अच्छा बताया है, बस ये सब ट्रैक के ऊपर नहीं करना है
@dharminderjagdeo8020
@dharminderjagdeo8020 3 жыл бұрын
sir agar barish main aisa incident ho toh khattra banta hai sir. mtlb neutral point ki baat kr reha leakage time sir ki earth time khatra bnn skta hai
@mohitsaini4655
@mohitsaini4655 3 жыл бұрын
Very nice information sir
@nknaturevidcam4013
@nknaturevidcam4013 11 ай бұрын
Ye safety gloves 25kv ka load sahan kar sakte hai kya
@randomraid6529
@randomraid6529 3 жыл бұрын
What is the length of discharge rod's lead in Indian railways?
@dfuhbvjcf5090
@dfuhbvjcf5090 3 жыл бұрын
It should be test the system no power before apply discharge. For safety reason...
@niharika5909
@niharika5909 4 жыл бұрын
V nice video sir
@AbdusSamad-zf3xu
@AbdusSamad-zf3xu 4 жыл бұрын
should be attached with mast? Rply plz
@haydaral-assadi8946
@haydaral-assadi8946 2 жыл бұрын
Thank you very much for the information that this is a good day future and good job and Syria and Iraq and Lebanon there's good to future for Indian people if you deal with Iran
@chainasinghmura2611
@chainasinghmura2611 3 жыл бұрын
Hello sir. Kea aap bata sekte hai kiy avi ohe kaa kaam kaha chal raha hai. Urgently
@sachinbangade9371
@sachinbangade9371 2 жыл бұрын
Vikas Sir earth bit pe lagana chahiye tha na connection
@indrajeetkumar2669
@indrajeetkumar2669 3 жыл бұрын
Discharge rode k cable kitna Squire mm ka hota hai
@vivekkumar-jx1pr
@vivekkumar-jx1pr Жыл бұрын
Good information bhai
@ASHOKKUMAR-wn2dh
@ASHOKKUMAR-wn2dh 3 жыл бұрын
Nice information
@munnamicle61
@munnamicle61 3 жыл бұрын
Sir aap Dono rel treks me clamp lga rhe hee lekin metro me ek hi reltrek me lgta hee
@danishkhangujarat
@danishkhangujarat 3 жыл бұрын
Nice bhai Super 💚👌👌
@kishorkumar-pb4vd
@kishorkumar-pb4vd 3 жыл бұрын
Discharge ko kitna minuts ke high voltage raude ko pakarna chaiye
@rahulpawarbhendimahal8908
@rahulpawarbhendimahal8908 2 жыл бұрын
Good work
@rameshsirisetty2842
@rameshsirisetty2842 3 жыл бұрын
what is the use
@mvraillover3058
@mvraillover3058 3 жыл бұрын
I love railway job
@bhagvatdhurve1570
@bhagvatdhurve1570 3 жыл бұрын
Ye kyo Kiya jata hai bataiye please
@AlokKumar-bl9pz
@AlokKumar-bl9pz 2 жыл бұрын
Ye bnta kaise hai sir
@ramanrajput933
@ramanrajput933 2 жыл бұрын
Discharge rod lagane se pahle voltage detector se line test kon karega???
@nknaturevidcam4013
@nknaturevidcam4013 11 ай бұрын
Agar galti se Kisi ne 25kv on Kar diya to Kya hoga
@rameshvishwkarma7419
@rameshvishwkarma7419 2 жыл бұрын
Super Ramesh Vishwakarma Electronic
@vijendrastudyofficial3.0
@vijendrastudyofficial3.0 2 жыл бұрын
Nice
@RanjeetKumar-xw9po
@RanjeetKumar-xw9po 4 жыл бұрын
What's formula for applying st,bt,rt,on bracket
@rajkaran6940
@rajkaran6940 4 жыл бұрын
Clamp positive line me and track ke bahar ki taraf lagayajata hae joki leed safe rahe
@gauravsinha7686
@gauravsinha7686 3 жыл бұрын
Negative rail me
@vikas199045
@vikas199045 3 жыл бұрын
It is CBTC technology both rails belongs to OHE
@anantakishorprusty8481
@anantakishorprusty8481 3 жыл бұрын
Why we do it.,?
@khethatyson3639
@khethatyson3639 2 жыл бұрын
Clamping both legs of the rail will defect the signaling system, I feel the process is wrong
@sachinsharma-ho7zx
@sachinsharma-ho7zx 2 жыл бұрын
Bhai yah arth road h mene bi kiya h asa Mene Railway me Apprentice training ki hai
@devthemysteriousboy3179
@devthemysteriousboy3179 2 жыл бұрын
Super
@mausamkumarkumar5363
@mausamkumarkumar5363 3 жыл бұрын
Thanks
@sachinbangade9371
@sachinbangade9371 2 жыл бұрын
Yogesh sir kaha hai
@rubulbhattacharya2021
@rubulbhattacharya2021 4 жыл бұрын
Sir yea sleepers kuch alag hai kya? Is it metro railway root?
@vikas199045
@vikas199045 4 жыл бұрын
Yes it is Metro
@zaidirctc3674
@zaidirctc3674 3 жыл бұрын
It is our regular track which is rarely used that's why rails are rusted and sleepers are un-oiled
@ramjilalmeena3140
@ramjilalmeena3140 3 жыл бұрын
Tek on and tek of kai bare mai.batao
@biswajitpradhan9667
@biswajitpradhan9667 3 жыл бұрын
Why it is used
@akashkumargabel4397
@akashkumargabel4397 2 жыл бұрын
सर लाइन को फेज जो की 25000v की है डिस्चार्ज करने पर लाइन कहाँ से बंद होता सामान्यतः शार्ट सर्किट होता है पर इसमें नहीं होता है बताने की कष्ट करें धन्यवाद
@vishalpaste1554
@vishalpaste1554 3 жыл бұрын
while discharging or earthling leakage current can current hits the body of track
@vikas199045
@vikas199045 3 жыл бұрын
Line is already discharge and this video is only for learning purpose
@vishalpaste1554
@vishalpaste1554 3 жыл бұрын
@@vikas199045 but if while this process is done if some one is contact with the track can he will get shock
@DRRR567
@DRRR567 3 жыл бұрын
Working on. 25kv is highly dangerous
@prafullagupta3702
@prafullagupta3702 4 жыл бұрын
Clamp kewal ek he rail me lagate h...kuki dono me se ek signal ki rail hoti h..
@vikas199045
@vikas199045 4 жыл бұрын
It is CBTC technology both rails belong to OHE
@VikramSingh-dn2ev
@VikramSingh-dn2ev 4 жыл бұрын
@@vikas199045 Is it Nagpur metro project site?
@vikas199045
@vikas199045 4 жыл бұрын
@vikaram Singh yes
@VikramSingh-dn2ev
@VikramSingh-dn2ev 4 жыл бұрын
I've been there for training on CBTC, OHE and depot equipments.🤗🤗
@vikas199045
@vikas199045 4 жыл бұрын
Great
@tonybhaibadarpur3824
@tonybhaibadarpur3824 2 жыл бұрын
30 साल पहले रेल लाइन मे नही, पोल म लगाते थे
@vikas199045
@vikas199045 2 жыл бұрын
Nice to hear you
@RohitKumar-pt1to
@RohitKumar-pt1to 3 жыл бұрын
Both rail ohe hi kya
@vikas199045
@vikas199045 3 жыл бұрын
Yes
@rrrgct5211
@rrrgct5211 3 жыл бұрын
Clamp sahi h?
@gauravsinha7686
@gauravsinha7686 3 жыл бұрын
Nhi
@HatkayTechnical
@HatkayTechnical 3 жыл бұрын
Main is video used karna chah raha hu apne video kya permission mile ge
@vikas199045
@vikas199045 3 жыл бұрын
Mail me details where you want to use this Video Vjha21@gmail.com
@pappumahato3666
@pappumahato3666 3 жыл бұрын
👍👍👍👌👌
@Eshwarchandran
@Eshwarchandran 4 жыл бұрын
What is the use of this method?
@melectricaltechnician6108
@melectricaltechnician6108 4 жыл бұрын
Kyun ki current bond karneke bad Kuch current rehjatehe
@shaik.janimiya6652
@shaik.janimiya6652 3 жыл бұрын
@@melectricaltechnician6108 Very good reply tq sir
@anilnair4553
@anilnair4553 3 жыл бұрын
Why it is done, can you share some information on it.
@piyushkumar-iy4vd
@piyushkumar-iy4vd 3 жыл бұрын
For safety purpose...traction return current can cause electric shock...some voltage may be present on ohe before energization... cantilever,insulator act as capacitor
@sibgathassan6281
@sibgathassan6281 3 жыл бұрын
Why we need to do it
@sibgathassan6281
@sibgathassan6281 3 жыл бұрын
@Jason Camden lol . I don't wanna hack someones instagram, you are crazy man
@AmitKumar-nl5dt
@AmitKumar-nl5dt 3 жыл бұрын
Bhaiyaa iska use kyu karte hai,aur sparking kyu nhi hua jab apne upar touch kiya to😐😐
@vikas199045
@vikas199045 3 жыл бұрын
Line discharge thi lagate Samay
@AmitKumar-nl5dt
@AmitKumar-nl5dt 3 жыл бұрын
@@vikas199045 thanks bhaiya❤️❤️ lekin ek bataiye hm पटरियों को छुएंगे तो हमे करंट नही लगेगा kyuki upar se current aa to raha hai na
@mahendrasonawane3480
@mahendrasonawane3480 3 жыл бұрын
Clam dono ral me kyu kiya
@vikas199045
@vikas199045 3 жыл бұрын
No issues while doing this because It is CBTC technology both rails belongs to OHE.
@ManvirSingh-wl9ou
@ManvirSingh-wl9ou 3 жыл бұрын
@@vikas199045 please tell me one thing....agar starting mein you said k copper wire valey conductor portion ko haath nahi lgana... what's the reason ?? Because insulation of this Single core conductor cable used is also not meant for 11kV....I hope you follow my point.... myself a Distribution Engineer from PSPCL...we really appreciate your efforts....Great Job Sir.
@hitendrakhatri4875
@hitendrakhatri4875 3 жыл бұрын
@@ManvirSingh-wl9ou इस सवाल का जवाब नहीं है शायद
@DRRR567
@DRRR567 3 жыл бұрын
What is purpose of it ? Whenever supply is off ?
@mtcemngr5292
@mtcemngr5292 3 жыл бұрын
यमराज सेना... OHE (Over-head Electric) line par kaam karnese pehle line ko off hee honaa chaahiye. Agar badkismathi se line meñ leak ho yaa line On hojaae tho earth hone kee wajeh se short circuit hokar circuit trip hojaaegaa aur karamchaari surakshith raheñge.
@sanju8516
@sanju8516 3 жыл бұрын
Jha ji
@taruneshpandey2114
@taruneshpandey2114 3 жыл бұрын
भाई आप का वीडियो सही बना ही पर आपने डिस्चार्ज रोड को 2 रेल में लगाया है बो आप का ग़लत है अगर यार्ड मै हो तो ट्रेक फेल हो जाएगा
@vikas199045
@vikas199045 3 жыл бұрын
It is CBTC technology both rails belongs to OHE and while doing this training line was discharge
@sachinbangade9371
@sachinbangade9371 2 жыл бұрын
Safety first
@rahullsingh3628
@rahullsingh3628 3 жыл бұрын
Mai roj karta hu bhai 3300 kv lain ka
@navneetwanve5405
@navneetwanve5405 3 жыл бұрын
3300 kv ya 33Kv
@rahullsingh3628
@rahullsingh3628 3 жыл бұрын
@@navneetwanve5405 abe gochu dono AK hi he n..
@DRRR567
@DRRR567 3 жыл бұрын
@@rahullsingh3628 no
@mrshaan8536
@mrshaan8536 Жыл бұрын
Bhai D rod assistant lagata h ya Technician??
@sachinsharma-ho7zx
@sachinsharma-ho7zx 2 жыл бұрын
Oechi dipartment
@shammohan8630
@shammohan8630 4 жыл бұрын
He sir
@RaviRavi-xm9tp
@RaviRavi-xm9tp 3 жыл бұрын
Hello sir
@sachinpaul2074
@sachinpaul2074 3 жыл бұрын
Ple bond to check krlo mre bhai
@vikas199045
@vikas199045 3 жыл бұрын
It is CBTC technology both rails belongs to OHE
@Gajendra97
@Gajendra97 3 жыл бұрын
ये क्लैंप दोनों में क्यों किया गलत किया है तुमने।एक s&t वाले का होता है।मैं भी trd में हु
@gauravsinha7686
@gauravsinha7686 3 жыл бұрын
Ekdum sahi
@vikas199045
@vikas199045 3 жыл бұрын
It is CBTC technology both rails belongs to OHE
@somveersingh7578
@somveersingh7578 Жыл бұрын
Sir apki tired mai job milegi kiya
@ramuanjaneyulu9544
@ramuanjaneyulu9544 3 жыл бұрын
Electrician
@shivajidhongade1996
@shivajidhongade1996 3 жыл бұрын
एवढी बारीक सारीक माहीती फक्त रेल्वे कर्मचार्यांना द्या..प्राईव्हेट पब्लिकला देऊ नका.
@chintadevi7062
@chintadevi7062 3 жыл бұрын
Bhai kam se kam Hindi mein comment karo aapka bhasha mere sar ke upar se Chala Gaya samundar ke lahron ki tarah
@RaviRavi-xm9tp
@RaviRavi-xm9tp 3 жыл бұрын
Mujhe bhi job do please
@prabhakarjha6027
@prabhakarjha6027 3 жыл бұрын
Jha ji apana mobile no dijiya
@vikas199045
@vikas199045 3 жыл бұрын
Mail me Vjha21@gmail.com
@deeptiranjanpanda2399
@deeptiranjanpanda2399 4 жыл бұрын
D-rod clamp must be fixed with -ve side rail instead of both rail of the track...Ensure to correct that thing in your vdo.
@mohammadimran3242
@mohammadimran3242 4 жыл бұрын
it is with CBTC technology. both rails belongs to OHE. no Plus or Minus rail.. FYI
@vikas199045
@vikas199045 4 жыл бұрын
@@mohammadimran3242 correct
@prafullagupta3702
@prafullagupta3702 4 жыл бұрын
You can only clamp in. Negative rail that belongs to ohe
@mitikag9481
@mitikag9481 3 жыл бұрын
Stone se rub karle bhai
@gauravsinha7686
@gauravsinha7686 3 жыл бұрын
Discharge rod ka insulation value 1tera ohm se jada hota hai gloves pehena ka nautanki mt karo
@umeshmotwani7213
@umeshmotwani7213 3 жыл бұрын
Ye sb kyu krte h
@nurhassan
@nurhassan Жыл бұрын
Didn't understand anything
@reenarihuli2318
@reenarihuli2318 2 жыл бұрын
Koi sefty nahi hai aap ke paas
@vikas199045
@vikas199045 2 жыл бұрын
Ok
@jaihindjaibharat5752
@jaihindjaibharat5752 3 жыл бұрын
While making video at least try to show proper workmanship. Instead of rubbing your clamp on rail tracks to remove rust you should have used emery paper aur 0 paper to clean the rail tracks properly and then bolt the clamps. Very poor engineering skills you have. Also at some point your telling not to touch the legs of the clamp. But while fixing the climb you yourself have touched the lugs many many times.. also check the direction of lugs fitted to clamp if it is downwards at least losing it and change its position so that it will not get damaged. Being as a engineer you need to learn a lot.
@vikas199045
@vikas199045 3 жыл бұрын
Thank you for your kind suggestions yes i need to learn a lot. Can you please tell , On which place we are doing this training? Without knowing history dont try to be smart. This is my personal channel and i am not putting video for monetization.
@jaihindjaibharat5752
@jaihindjaibharat5752 3 жыл бұрын
@@vikas199045 when you put any thing on electronic media, it doesn't remain private. If you are putting some content on media for people to watch and learn, then put correct method and let people learn the correct procedure. By putting your incorrect methods / operating procedures, you are either fooling/ misguiding people. It is very wrong. What is wrong if you adapt and follow correct procedure.
@vikas199045
@vikas199045 2 жыл бұрын
@@jaihindjaibharat5752 again I am asking did you work in metro, if yes then only give me your reply otherwise please learn about metro work procedure and circumstances. I know engineering much better than you
@jaihindjaibharat5752
@jaihindjaibharat5752 2 жыл бұрын
@@vikas199045 your comment only shows the level of knowledge you have gained from your schooling. This arrogance inside you shows your nature and behaviour. You are not the only one engineer in the world who has done engineering and is working in some technical field. Instead of accepting your mistake of poor workmanship, you are trying to cover up the issue by just asking the circumstances under which you work. The basic rule of safety in engineering is to "never compromise with safety or workmanship" while working under any circumstances. Related to your working in metro you are not the only engineer working in the world in any metro rail. There can be many more people like you and me working in metro rail systems. A good engineer is one who learn from the mistakes not try to hide his shortcomings or mistakes and blaming the organisation for your own professional incompetence.
@vikas199045
@vikas199045 2 жыл бұрын
Again you are putting same message which is non relevant to anything and again I want to tell you that this metro depot yard which is not charged. Non serviceable track is also there, so again I am requesting you to please before posting any comments first get clear about things. 2nd you are never came here to share your experiences and knowledge, because your message it self says that, whenever you want to convey your message to anyone please be kind,the same thing you can say as dear I observed this this points in your video get clear it . But you just came here to prove your self master nothing else
@gauravsinha7686
@gauravsinha7686 3 жыл бұрын
Tum fail ho practical me
@amitk171
@amitk171 3 жыл бұрын
Kaise?
@thallapallirajalingaiah1296
@thallapallirajalingaiah1296 3 жыл бұрын
Nice
@maniklalparaste2116
@maniklalparaste2116 3 жыл бұрын
Thanks
@chainasinghmura2611
@chainasinghmura2611 3 жыл бұрын
Hello sir. Kea aap bata sekte hai kiy avi ohe kaa kaam kaha chal raha hai. Urgently
Discharge Rod use in Hindi ll 11kv , 33kv Discharge rod Connection
8:01
ELECTRICAL ENGINEER
Рет қаралды 12 М.
Climbing to 18M Subscribers 🎉
00:32
Matt Larose
Рет қаралды 35 МЛН
World’s Deadliest Obstacle Course!
28:25
MrBeast
Рет қаралды 118 МЛН
I’m just a kid 🥹🥰 LeoNata family #shorts
00:12
LeoNata Family
Рет қаралды 14 МЛН
OHE Isolator Handle Operation
4:21
South central Railway (Duties of Points man & S.M)
Рет қаралды 4,8 М.
OHE jumpers in Indian Railways
5:11
Railway Electrification DK Sharma
Рет қаралды 30 М.
Droppers in OHE| Dropper Length| Dropper Spacing| Railway Electrification| OHE work| Railway work
22:37
25 KV OHE Catenary wire splicing Indian Railway..in Hindi
11:02
Rail Gyanpark
Рет қаралды 21 М.
Climbing to 18M Subscribers 🎉
00:32
Matt Larose
Рет қаралды 35 МЛН