So for a 4m by 4 m bathroom you need 40mm of fall to a drain?
@DavidPrevite-WaterproofExpert3 ай бұрын
@JeremyBenda-b9e it would be 45mm at a 1:80 gradient
@josesuarez57165 ай бұрын
Now, how to achieve minimum 200mm slab for fire rating, without having a ridge 1:80 (12.5mm per meter) higher than the empire state building ?
@DavidPrevite-WaterproofExpert5 ай бұрын
time to buy up concrete because when this comes in we are going to need alot more of it to get these projects built
@GolkurKisel3 ай бұрын
Could you expand on this please? I´m not sure I´m following? Much appreciated!
@ojwilla3 ай бұрын
So I guess this solves the before or after screed argument
@DavidPrevite-WaterproofExpert3 ай бұрын
@ojwilla it certainly does (for external areas) unless you are considering a performance based design
@madirishchef5 ай бұрын
Goodbye screeds indeed. 70mm stepdown, about time. Structural falls 1:80-concreters will hate this. I just hope that those responsible for the soon to be revised AS4564 are on the same page.
@DavidPrevite-WaterproofExpert5 ай бұрын
i think it is going to take some time to get alignment on such substantial changes. blacklisting screeds is a big pill to swallow