@@clayton4115 ARTC Control at Junee NSW may have wished to check the integrity of the track circuit, easiest way to do this is run a train through. Track circuits are tested as per periodic testing rota or complaint from train crew about a signal irregularity.
@clayton411515 күн бұрын
@@dieseldavetrains8988 ok they do it up here as well the loop tracks