OEE vs Machine Efficiency vs Operator Efficiency | Production Engineer & Supervisor Training Video

  Рет қаралды 20,485

AYT India Academy

AYT India Academy

Жыл бұрын

OEE (ओ. ई ई.), मशीन एफिशिएंसी, ऑपरेटर एफिशिएंसी, में क्या अंतर है और कैसे calculate करे ??
आप इन लिंक पर क्लिक कर के ऑन लाइन ट्रेनिंग कोर्स के लिए अभी रजिस्टर कर सकते है
DPR with OEE Downloadable Formats : tinyurl.com/a5ne3uky
DPR | OEE | HPR | DRR | RBA | Most IMPORTANT !! Daily Production & Quality Reports & Formats : • DPR | OEE | HPR | DRR ...
AYT India Academy Training App has been launched,
Download Link (AYT इंडिया अकैडमी एप्प अभी डाउनलोड करे) clphaward.page.link/VToQ
AYT Online Training Website : learn.aytindia.com
Resume & Interview Tips Online Training : tinyurl.com/2p8ppjpy
Maintenance Systems (12 Formats) Online Training Course : tinyurl.com/3y8rrt6y
DPR (Daily Production Report),
HPR (Hourly Production Report),
OEE Sheet,
3 Different Industries oee sheet,
Daily Rejection Format,
Daily Rework Format,
Monthly Graphs,
OEE Formats,
DPR Formats,
Hourly Report Formats,
Rejection Rework Formats,
Red Bin Analysis Formats,
DPR,
OEE,
Store Keeper Online Training Course : tinyurl.com/45w5ujup
AYT Enquiry Form : tinyurl.com/3zhk66cp
___
------
Visit Our Website @ www.aytindia.com
AYT India Academy YT @ / aytindiaacademy
AYT India FB Group @ / aytindia
AYT India FB Page @ / aytindiaacademy
Linkedin @ / shakir-mohd-483a75103
_____________________________________________________________________
Channel Videos:
* What is TPM & TPM 8 Pillars : • What is TPM & TPM 8 Pi...
* 7 Quality Control Tools : • 7 Quality Control Tool...
* What is KAIZEN CONCEPT of LEAN : • What is KAIZEN CONCEPT...
* Lean Manufacturing सिर्फ 15 मिनट में सीखें (हिंदी) : • Lean Manufacturing सिर...
* What is O.E.E (Overall Equipment Effectiveness): • What is O.E.E (Overall...
____________________________________________________________________
Channel Playlists:
* LEAN Manufacturing : tinyurl.com/y3ztccm8
* Interview Tips : • इंटरव्यू और रिज्यूमे म...
* Quality & Systems : tinyurl.com/yx8ucoux
* TPM (Total Productive Maintenance) : tinyurl.com/y3f3n8kw
* Inventory & Store Management Series : tinyurl.com/y3gwrxus
* G-Suite- Google Form, Google Sheet etc. : tinyurl.com/y3ppcty9
* PPT / MS- PowerPoint Classes : tinyurl.com/y37eyph5
---
About Myself: Shakir Mohd (Founder & CEO - AYT Business Solutions)
• I am a B.Tech in Mechanical Engineering
• I have total working Experience of Around 10 Years in Training, Execution and Implementations of Various Lean Tools and Techniques (such as VSM, KAIZEN, TPM, 5S, Visual Management, Poka-yoke, SMED etc.) in approx. 150 Units.
• I have a wide exposure for Implementation of Lean Manufacturing Tools & Techniques to different industries like Automobile, Engineering, Food Industries, Leather Handicrafts, Leather Garments, Garments, Printing, Packaging, Shoes Industries, Plastic Injection Moulding, Aluminum Die Casting, CNC Machining, Conventional Machining, Tool Room, Press Shop, Fan Industry, Bicycle Industry, Fabrication & Sheet Metal etc. for improving their Productivity, Reducing Manufacturing cost & Rejection, 5S Levels, Employees Trainings with proper resource utilization and Implementation of various Kaizens (Improvements).
Key Skills:
• Value Stream Mapping (VSM), TIMWOOD (Seven Wastages), PQCDSME (Seven Benefits) Productivity Improvement, Time & Motion Study,
• Google Sheets and G-Suits
• TPM (Total Productive Maintenance), FUGAI Tags, 8 Pillars of TPM , Elimination of Six Big Losses (SSSMCB) through TPM
• 5S, KAIZEN, 7 QC Tools, VA/NVA Activities, Root cause analysis, SMED, Safety Improvements, Visual Management, etc.
----
SOME OF MY ONSITE PROJECTs OF TRAINING & CONSULTANCY, COMPLETED/ UNDER-PROCESS ARE:
Ultratech Cement (4 Plants)- Truck Turn Around Time (TAT) Prject
Combit Shoes, Bahadurgarh (HR)- Plant Layout Setup Project
Printsmith (Infinity Advertising Pvt. Ltd.),Faridabad
MSME- Faridabad Engineering Cluster No.1 (9 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.2 (6 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.4 (7 Units)- LMCS Cluster
MSME- Yamuna Nagar Engineering & Fabrication Cluster (9 Units)- LMCS Cluster
MSME- Ludhiana Cycle Parts Cluster No.2 (7 Units)- LMCS Cluster
MSME- Manesar, Leather Handicraft Cluster No.1 (7 Units)- LMCS Cluster
MSME- Bahadurgarh Footwear Cluster (6 Units)- LMCS Cluster
MSME- GZB Food Cluster (9 Units)- LMCS Cluster
Raga Engineers- Core Pins Productivity Improvement Project, Faridabad (HR)
Raga Engineers- Crack Toyota Project, Faridabad (HR)
Technomech Industries, Faridabad (HR)
Woodpecker Systems, Faridabad
Falcon Vacuum Pumps, Faridabad
PMT Engineers, Faridabad
UD food Products Pvt. Ltd., Ghaziabad
GK Industries, Faridabad
& Many More

Пікірлер: 18
@rvashu_1023
@rvashu_1023 Жыл бұрын
Sir apke smjhane ka tarika bahot hi srl jisse asani se smjh ajata h , Apka example de k smjhane ka tarika kafi achha lgta h .... Thanks sir
@aytindia
@aytindia Жыл бұрын
Your Most Welcome, Keep Watching & Sharing
@sandeeppandey7852
@sandeeppandey7852 Жыл бұрын
Realy nice love u
@nashatmobile4448
@nashatmobile4448 10 ай бұрын
Very nice
@sanjeevshrivastav4188
@sanjeevshrivastav4188 Жыл бұрын
Pls make video IATF sir
@cricketlovers8767
@cricketlovers8767 Жыл бұрын
Please make a video for smt quality engineer Role and Responsibilities
@piyushkharmale6554
@piyushkharmale6554 3 ай бұрын
Thanks for explaining detailed calculations, But I have 2 general questions : 1. What can be the highest OEE achieved in real world ? 2.What is average OEE achieved in most of the case ?
@aytindia
@aytindia 3 ай бұрын
1. If Actually Recorded-- Above 85% 2. Around 65 to 70%
@spiritualgyan2009
@spiritualgyan2009 6 ай бұрын
Sir how to get 350 in actual produced QTY (H) Plz reply
@parveensharma4071
@parveensharma4071 6 ай бұрын
Cost control & cost reduction pe bno pls sir
@ankitkrishnam
@ankitkrishnam Жыл бұрын
Overall line Efficiency par bhi video banayen Sir
@aytindia
@aytindia Жыл бұрын
soon
@jaisaini7094
@jaisaini7094 Жыл бұрын
Maintenance department ke baare mein ek full video banao sir
@aytindia
@aytindia Жыл бұрын
Pl check our app course already available for maintenance with ready to use formats : bzxqj.courses.store/214071?Dother%26Dtutor-course-referral%26Dcourse-overview-webapp
@adarshsingh45
@adarshsingh45 Жыл бұрын
Please vedio cp and cpk sir👏👏👏
@rakeshmhil
@rakeshmhil Жыл бұрын
If load /plan Nahi hai puri shift ka if 4 hrs ka hi load hai tab Baki 4 hrs ka kya Karna hai . Haney 8 hrs ki shift Mai 4 hour hi machine plan ki hai tab Availability 100 percent rehegi or 50 percent
@aytindia
@aytindia Жыл бұрын
100
@CrazyGamer-md2dm
@CrazyGamer-md2dm Жыл бұрын
@@aytindia Sir plan time 8 hour legey ya 4 hour avalibility calculate karney ke liye. Pl reply
HOW DID HE WIN? 😱
00:33
Topper Guild
Рет қаралды 34 МЛН
버블티로 체감되는 요즘 물가
00:16
진영민yeongmin
Рет қаралды 108 МЛН
Дибала против вратаря Легенды
00:33
Mr. Oleynik
Рет қаралды 4,9 МЛН
How to calculate OEE ? OEE Calculation in Hindi
18:38
JIT INDIA
Рет қаралды 14 М.
OVERALL EQUIPMNT EFECTIVENESS ! OEE !! ASK MECHNOLOGY !!!
14:53
ASK Mechnology
Рет қаралды 79 М.
PRODUCTION ENGINEER interview questions -  how to calculate operator efficiency #interview #cnc
5:34
CNC CAD CAM ACADEMY of SIGMA YOUTH ENGINEERS
Рет қаралды 8 М.
Cycle time, Takt time & Lead time in Hindi
13:57
Interview Questions with Sharma Ji
Рет қаралды 258 М.
HOW DID HE WIN? 😱
00:33
Topper Guild
Рет қаралды 34 МЛН