It's really explained in a way that even an idiot can understand. As an idiot, I must say that I finally understood after watching 5 videos. Thank you very much sir.
@BIMModeller3 ай бұрын
I'm glad. Please share it with your learning friends on LinkedIn 😊🎉
@swapnilkadam-m1l Жыл бұрын
great sir, great section Regards Er Swapnil
@barisyuksel4050 Жыл бұрын
bro, you told me so well, LIKE BOLLYWOOD MOVIES, thanks
@BIMModeller Жыл бұрын
Thank you share it with your learning friends on LinkedIn
@HarshaVardhan-zg5qc7 ай бұрын
I humbly thank you sir...
@BIMModeller7 ай бұрын
You are most Welcome!
@prmodrwt2 жыл бұрын
Thanks for Good content. 1. Suppose I have cement qty in wall schedule and also have cement qty in floor schedule, concrete schedule etc. Now how can I have parameter which give me total cement qty from all schedules (wall schedule, floor schedule, concrete schedule) 2. Can schedule be automatically updates in Excel.
@BIMModeller2 жыл бұрын
hi Prmod, Welcome. Then share it with your learning friends on LinkedIn! 1. You have to try using Material Takeoff Option and Multi-Category. Not the normal Schedule. Then it will list all elements with specific materials. If needed I will add a Video. 2. Check this Video - kzbin.info/www/bejne/aWPMlZeVp9Gnr68 Cheers!