Рет қаралды 4,197
Burr Stewart narrates this video recap of an all-day model railroad operating session, conducted on March 27, 2022, the third and final day of a bi-annual operations weekend in Seattle called "SoundRails". At this particular session, there were 11 visiting operators from around the US and three hosts, for a total of 14 people running trains all day in this 24' x 30' basement model train layout. The action starts out with the "jet job" finishing its work in Mukilteo and a MILW coast route train, proceeds to cover several north and south BN through freights, numerous switching operations, and finally the BN's "Pacific Zip" train #3 comes in and then #4 heads off into the sunset. Burr narrates the action with comments about the history of the BN railroad as well as some of the fun and challenges of model railroad operations and maintenance.
The HO scale model railroad underneath these train operations is Burr Stewart's "Burrlington Northern" model railroad layout, featured in many other videos on this KZbin channel @Burr Stewart , as well as his blog burrlingtonnor.... The train layout is set in the Seattle region in 1973, three years after the 1970 corporate merger that created the Burlington Northern (BN) Railroad out of the Great Northern (GN), Northern Pacific (NP), Burlington Route (CB&Q) and the Spokane, Portland and Seattle (SP&S) railroads. Playing smaller roles on the layout are the three-foot narrow gage (HOn3) D&RGW "west coast extension", the Milwaukee Road (MILW)'s western extension and the Union Pacific (UP). He took the video with an iPhone X and an AKASO action cam, and edited it in iMovie and Photoshop on a MacBook Pro.