It has been refreshing for us to keep watching your videos on KZbin for the past few weeks.We all kindly request you to keep making and posting such piping related videos and at least you should post more than one video per day.
@faizalrmajeed10292 жыл бұрын
very useful....i was doubtful with back seat testing....now its clear
@aghilmoghbeli76262 жыл бұрын
Thank you Sir for new and very nice videos I am very happy with this videos, please prepare a video about valve trimes and trim materials. Best regards
@rajeshmavia54242 жыл бұрын
Nailed it sir. But for seat test test and backseat test you have written 1.5times instead of 1.2. very happy to post videos often.my humble you to Keep on continuing
@vtbhanukiran12312 жыл бұрын
Thank you for the video. Beautiful one. For backseat test of gate or globe valve, the valve should have a back seat bush and the valve should be in fully open condition. With spindle chamfered portion mating with back seat bush in fully open condition.
@sen-ow7ub2 жыл бұрын
We are learnt well about the valve testing , like body testing, pressure testing or seat leakage test. And backseat test exclusive for gate valve and globe valve. Thanks lot sir. Please make more videos.
@sen-ow7ub2 жыл бұрын
I humbly request you to keep posting more piping related videos. Thanks
@duraiac44272 жыл бұрын
Good explanations & easy to understand pratically.
@vigneshwaran36 Жыл бұрын
Awesome explain about the pressure testing for GV. thanks you so much
@asrs704922 күн бұрын
Very informative
@randomvideosindia8694 Жыл бұрын
Sir your this video helped me a lot to understand
@p.gunasekaran8081 Жыл бұрын
Wonderful explanation...!!
@avijitshyam2 жыл бұрын
Brilliant explanation.
@sen-ow7ub2 жыл бұрын
The amazing explanation i have never seen such kind of explanation before. Awesome thanks, sir. Please could you explain some of the valves identify Field Valve Test .These valves should be tested on site also as per Aramco STD. may be the reason for double checking, there is the possibility of valves may be slightly damaged during the transportation or any other reason. Do you have any idea or experience about such kind of critical valve should be tested in site. Even if already done all the tests in Shop. Please explain verbally. Thanks, sir may be below the valve please explain this under site test TSO control valves, crude recycle PV, min flow recycle valves, suction KODs LCV, hot oil ring spill back CV), MOVs that are used for equipment or train/system isolation they must be tested. Testing shall include at least the DBB and not only single valve. please dedicated post on this topic. thanks
@dhilleerao82913 ай бұрын
Very useful
@ahteshamsaiyed26965 күн бұрын
Sir plz explain the procedure of Hydro DBB (double block & bleed ) test
@suryanathyadav8830 Жыл бұрын
Good description
@manojalvandar9810 Жыл бұрын
How clamping pressure of a valve is determined from shell test pressure ?
@sen-ow7ub2 жыл бұрын
After purchasing the valves from the vendor and keeping them in warehouse for six months, we are not able to install them at the site due delay of activities , in this situation if more than 6 months, the valve whether need to test again before installing to site.
@mukundmistry1661 Жыл бұрын
Dear sir, kindly please share that chart testing which is you highlighted 🙏🙏
@saquibkhan12309 ай бұрын
What is control valve Seat leakage Calculation Formula.
@penugondasuryakumar86322 жыл бұрын
Thank you sir
@thecros1076 Жыл бұрын
Can piston lift check valve be used in Cryogenic flow ?