After getting some holes augered with the bobcat and a day off camera with a jackhammer and shovel, A builder came in and built the pole building. Now its my turn to take over. I start buy roughing in some utilities. First electric from meter base to the house, then the septic tank gets exposed for when the sanitary is ready to connect, but I put risers on while I was at it. Finally the grading for sanitary lines that will end up under concrete. The will be a series of videos about this project. Thanks for watching.