We have a president with a vision. Thank you, President Ali. Guyana is on the right track.🇬🇾✨✨✨
@kd2302 күн бұрын
I believe it is impossible for the new Demerara Harbour Bridge to be finished in March 2025. ????
@guyanaplaces5922 күн бұрын
Everything is already prefabricated. The fittings will take just 2 months once the posts and columns are completed.
@KevinPersaud-h9e5 сағат бұрын
MARCH 2026???
@OwenWilliamson-g6o2 күн бұрын
Guyana is a very nice place but Jamaica is better me love 💕 Guyana 🇬🇾🇬🇾🇬🇾🇯🇲🇬🇫🇸🇷
@tickedoffsheikh85872 күн бұрын
What are you really trying to say?
@richard59415 сағат бұрын
The Demerara harbour bridge is being built by Chinese engineers, not the local guys whose roads don’t last six months.
@mikeandrews65432 күн бұрын
Why was that site chosen for the gas to shore project so many miles inland as opposed to somewhere closer to the ocean ,wouldn't the cost of materials have been less for it's construction etc
@MJYoutubers15 сағат бұрын
Coastal Guyana is prone to flooding and water and gas don’t mix well
@mikeandrews65437 сағат бұрын
@MJKZbinrs so isn't Wales/ Renistein part of coastal plane in Guyana