Рет қаралды 3,239
This example problem is in Module 11 of my Prestressed Concrete Design course (Prestress Loss). This example goes through how to calculate prestress loss of a decked bulb-tee girder using the AASHTO LRFD (2017) Refined Method and PCI Handbook Method (2010). The deck is cast with the precast girder for this section.